52
UTBS 1.0
UTBS 1.0
UTBS 1.0
UTBS 1.0
Isolate the electrical power supply again. Re-connect all of the other cables to the Corrigo
controller and fi nally re-energise UTBS PRO-REG and the reset procedure is now complete.
The run mode of the system (I.e VAV/CAV/COP) should now be re-set-up, together with
ensuring that the additional parameters (K-Constant, heater type etc.) are correct.
CONTROLLER RECONFIGURATION
¡IMPORTANT!
After reset the controller, it is necessary to reconfi gure the unit, as the factory set-
tings are deleted.
Содержание UTBS PRO-REG Series
Страница 1: ...SERIE UTBS PRO REG EN...
Страница 2: ......
Страница 29: ...29 10 CONTROL DIAGRAM Version with electric batteries...
Страница 30: ...30 Versions with hot and or cold water coils...
Страница 31: ...31 Versions with reversible water coil...
Страница 62: ...62 22 WIRING DIAGRAMS...
Страница 63: ...63...
Страница 64: ...64...
Страница 65: ...65...
Страница 66: ...66...
Страница 67: ...67...
Страница 68: ...68...
Страница 69: ...69...
Страница 70: ...70...
Страница 71: ...71...