![S&C 5800 Series Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/sandc/5800-series/5800-series_operating-instructions-manual_3071562016.webp)
16 S&C Instruction Sheet 1041-540
Installation
Based on this information, the Control software decides how to respond to a possible
overcurrent fault, a change in voltage, a command from the faceplate or SCADA master
station, and other conditions.
The control software, the setpoint values, and historical data are all stored in non-volatile
switch control memory. This memory survives power interruptions, including complete
loss of the battery system.
Battery Backed Non-volatile SRAM
The memory and perpetual calender are implemented with battery-backed non-volatile
SRAM with a 10-year battery life in the non-powered state; this is no battery draw when
control power is connected. The real time clock IC is battery-backed as well which
counts seconds, minutes, hours, days, day of the week, date, month and year with leap
year compensation up to 2100.
The IntelliLink software
The IntelliLink software is supplied on the Setup disk and runs on IBM/PC-compatible
computers. This software enables communication with the control software while at the
switch control site. Using the IntelliLink software, users can:
• Enter installation-dependent operating parameters (setpoints), such as a network
address, automatic operation features, etc.
• Monitor real-time data, such as the present line voltage and current
• Examine the performance and operating history of an installed switch control
• Transfer all configuration, operating, and historical data from the switch control to
a “report” file on your computer
• Download new control software into the switch control
• Troubleshoot assorted types of switch control installation problems
SCADA Communications Equipment
5800 Series switch controls include two remote communications access ports. When
combined with suitable communications equipment and protocols, this permits users
to remotely monitor, control, and change setpoints for the switch control installation.
S&C supports the 5800 Series controls with a variety of communications hardware
options and software protocols, including:
• DNP 3.0 (default protocol)
• PG&E SCADA (Cooper 2179)
• Landis & Gyr Telegyr 8979
• Schlumberger’s UtiliNet®
• Schlumberger’s CellNet®
• Cellular telephones
• Fiber optics
• Phone lines
The communications hardware (radio, modem, etc.) is mounted inside the switch
control enclosure on the universal communications mounting plate on the back of the
faceplate. This eliminates clutter and provides a higher level of reliability for the overall
installation.
For more details, see the manufacturer’s documentation or contact S&C.