23
/
66
Picture 6-9 Cabinet Installation
6.1.4 Attention Notes
:
1. During the installation process, pay attention to the protection of the cabinet to
prevent the cabinet surface from being bumped and the cabinet from tipping over.
2. Use the new floor stand for a maximum installation height of 4M.
3. Before installing each cabinet, you need to connect the power cord and conduct
pretesting to ensure that there is no abnormality before installing.
6.2 Hanging
In the case of installation locations changing frequently, hanging is usually used,
which is common in the rental market. For the VMR-O HD Series, Samsung provides
customers with a truss and FlyKit for quick haing installation. The following are
detailed steps.
6.2.1 Preparatory Work
1. Select the installation area of the VMR-O HD display, and enclose it with a safety
warning band. Non-workers should not enter without permission, keep the installation
area clean, free from dirt and debris.
2. Ensure that you have read, understood and followed all of the security issues
mentioned in Chapter 1 before installation.
3. Make sure that the installed LED cabinet, accessories, tools and other materials
are in place to prevent the troubles.
6.2.2 Screen Installation
1. At the installation site, first set up the truss of the hanging screen (or similar
structure that can be suspended), as shown in Picture 6-11.
Содержание VMR-O P3.9
Страница 1: ...1 66 Product Manual VMR O P3 9 ...
Страница 34: ...34 66 Appendix A Dimensional Drawing of Main Components A 1 VMR O VMR O P3 9 Flat Panel Curve Panel A 2 Flykit ...
Страница 41: ...41 66 C 5 Plastic hammer ...
Страница 49: ...49 66 ...
Страница 53: ...53 66 F8 Press the lock handle according to the mark to lock the cabinet as shown below ...
Страница 55: ...55 66 G4 Open the back cover of the power supply cabinet as shown below as shown below ...