54
Screen connection setting
Choose the `Screen Connection` as shown in Fig 9-8.
Fig 9-8
Read File:
Load connection table file from PC, the file is saved and sent out by the
manufacturer.
Save File:
Save one new connection table file after adjust parameter.
Read From HW:
Read the connection table parameter which is saved to all the scan boards
in cabinets.
Send To HW:
Sent the connection table parameter which is loaded to all the scan boards in
cabinets.
Save:
Save the connection table parameter which is sent to all the scan boards in cabinets.
After saving, you will not need to operate again.
Save Config File:
Save all the configuration which is sent to all the scan boards in cabinets.
After saving, you will not need to operate again.
Attention:
Usually we will make the connection table file and send it to the user, but if you
want use it, you must connect data cables according to data cable connection drawing which
the manufacturer provides. Otherwise you should make a new one for your own connection.
More operation details for Nova Control system should be check in software.
Содержание P10
Страница 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Страница 12: ...12 3 2 Product Appearance ...
Страница 13: ...13 ...
Страница 14: ...14 3 3 Product design Decomposition chart ...
Страница 15: ...15 Assembly drawing ...
Страница 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Страница 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Страница 35: ...35 Installation of cabinets Fixing of connect plate ...
Страница 41: ...41 8 Connection of the LED screen 8 1 Connection for equipments Connection between Sending box and PC ...
Страница 42: ...42 8 2 Port of Cabinet and serial number paint ...
Страница 59: ...59 ...
Страница 68: ...68 ...
Страница 79: ...79 Click Next to open the page for Step 3 ...