Power distribution box
Since the LED screen product is an industrial-class product and has a relatively large
power, it uses a high-power switch power supply. So, the start-up impact current at start
up is relatively large. And then, the air switch which is used in the power distribution box
needs to use a D-type switch. Prevent the screen from jumping when starting
Cooling System
If the customer want that the LED screen working normally for a long time. He should pay
attention for the cooling system for control the temperature inside the steel structure, at
least less than 45 degrees Celsius.
A.
If the LED display dimension is less than 20 square meter, not need to install air
condition, 2 air flow is enough.
B.
If the LED display dimension is more than 20 square meter, and the LED display screen
is installed on the wall with 1 meter distance, must to install enough air condition or air flow
as the cooling system.
If use air flow , it should be installed on two sides of the LED screen. At least per 3-4M
height should install 2 air flow on two sides of LED screen, the air flow should use suction
type one. it means the air flow should take out the air from structure and cabinet. And if the
LED display screen is more wide than 10M, should install more air flow inside steel
structure to make sure all the area air can be took out . Usually per 5M need to add a air
flow.When the air flow is installed , the protection net should be also installed for protect
service person and equipment.Also there should be air inlet on the bottom of the steel
structure.
If choose air condition, should install it inside the steel structure and make sure there is
enough space for installation of air condition. Generally, air condition type is 1.5P, 2P or 3P.
Per 9-12 square meter will use 1P air condition, depend on local temperature.
C.
If the LED display use a pole steel structure to hold it, the best cooling system is air flow.
Install the air flow on the upper area of the LED display screen, and put the air inlet on the
bottom of the steel structure, there will be a complete air convection inside the steel
structure, will get the best ventilation effect.
Содержание P10
Страница 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Страница 12: ...12 3 2 Product Appearance ...
Страница 13: ...13 ...
Страница 14: ...14 3 3 Product design Decomposition chart ...
Страница 15: ...15 Assembly drawing ...
Страница 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Страница 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Страница 35: ...35 Installation of cabinets Fixing of connect plate ...
Страница 41: ...41 8 Connection of the LED screen 8 1 Connection for equipments Connection between Sending box and PC ...
Страница 42: ...42 8 2 Port of Cabinet and serial number paint ...
Страница 59: ...59 ...
Страница 68: ...68 ...
Страница 79: ...79 Click Next to open the page for Step 3 ...