5. Measure the first row by spirit level, make sure it is installed horizontally, then fix the nuts
tightly between the cabinets and the connect plates.
6. Place the middle cabinet in the second row, adjust it and fix it but not tight. Make sure it is
installed horizontally and vertically, then fix it tightly as shown as below
7. Finish the second row by the same way as shown as below
8. Finish the rest installation of all the cabinets by the same way as shown as below.
Содержание P10
Страница 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Страница 12: ...12 3 2 Product Appearance ...
Страница 13: ...13 ...
Страница 14: ...14 3 3 Product design Decomposition chart ...
Страница 15: ...15 Assembly drawing ...
Страница 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Страница 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Страница 35: ...35 Installation of cabinets Fixing of connect plate ...
Страница 41: ...41 8 Connection of the LED screen 8 1 Connection for equipments Connection between Sending box and PC ...
Страница 42: ...42 8 2 Port of Cabinet and serial number paint ...
Страница 59: ...59 ...
Страница 68: ...68 ...
Страница 79: ...79 Click Next to open the page for Step 3 ...