93
Apply
Apply adjustment operations to the selected area.
Erase or reload Coefficients
Shown in Fig.9-33 is the page for erasing/reload calibration coefficients.
Erase coefficients: erasing calibration coefficients of the whole display or any cabinets.
Reload coefficients: reload the calibration coefficients lastly saved in hardware.
Fig 9-33
Screen
Select this option to erase all calibration coefficients for the whole display.
Topology or List
Select this option to select the cabinets from the cabinet array sketch or the cabinet list of
which the calibration coefficients are to be erased.
Содержание P10
Страница 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Страница 12: ...12 3 2 Product Appearance ...
Страница 13: ...13 ...
Страница 14: ...14 3 3 Product design Decomposition chart ...
Страница 15: ...15 Assembly drawing ...
Страница 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Страница 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Страница 35: ...35 Installation of cabinets Fixing of connect plate ...
Страница 41: ...41 8 Connection of the LED screen 8 1 Connection for equipments Connection between Sending box and PC ...
Страница 42: ...42 8 2 Port of Cabinet and serial number paint ...
Страница 59: ...59 ...
Страница 68: ...68 ...
Страница 79: ...79 Click Next to open the page for Step 3 ...