5
R. 03/18 853 809
SAMOA Industrial, S.A. · Pol. Ind. Porceyo, I-14 · Camino del Fontán, 831 · 33392 - Gijón - Spain · Tel.: +34 985 381 488 · www.samoaindustrial.com
2018_03_20-10:00
EN
REPAIR AND CLEANING PROCEDURE
Fig. 5a
Fig. 5b
49
58
57
59
64
65
66
67
68
69
60
For easier service, it is recommended to stop the pump near
the lowest stroke position.
1.
Unscrew the tube (69) from the pump body (59).
2.
Unscrew the piston (68) from the rod (49). Take away the ball (65)
and the washer (66). Replace the V-ring (67).
3.
Unscrew bolts (60), remove the outlet body (59) and replace the
seals (58, 64) and guide ring (57).
4.
Reassemble in reverse order, applying thread locker in all joints.
5.
All these seals are included in the available kit 539302.
LOWER SEALS KIT
Fig. 6
PAGE: 23, 28 and 29.
PARTS LIST / TECHNICAL DATA / DIMENSIONS
LIPS
FACING
UP
LIPS
FACING
UP