Use of equipment
582108110-EN-indG-Pompe Azur-52C225.docx
62
12.4
Diagnostic help / Troubleshooting guide
Troubleshooting
Before any intervention on a pump, it is imperative to carry out a
general procedure of decompression and purge.
In order to avoid the risk of personal injury, product injections, injuries
caused by moving parts or arcing, it is essential to follow the following
procedure before any intervention during system shutdown, assembly,
cleaning or changing the nozzle.
Lock the guns (valve, tap, etc.) to OFF.
Shut off the air supply through the decompression valve
in order to evacuate the residual air from the motor.
Unlock the gun (valve, tap ...).
Bring the gun (valve, tap ...) to a metal bucket to collect
the product. Hold it against the wall of this bucket to
avoid interrupting the continuity of the earthing (use the
wire with stirrup to put the metal bucket to earth).
Open the gun (valve, tap) to bleed the circuit.
Lock the gun (valve, tap) to OFF.
Open the pump bleed valve and collect the product in
a well-grounded metal bucket.
Leave this purge valve open during the whole period of
the operation.
Check the conformity of the wiring before intervention.
Содержание 64350225130000
Страница 41: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 41 8 Equipment plans Pump 52C225...
Страница 42: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 42 Wall mounted pump...
Страница 43: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 43 Pump 52C225 Cart...
Страница 44: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 44 Pump 52C225 Cart Hopper...
Страница 45: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 45 Fluid section C225...
Страница 46: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 46 Motor 7000 Stroke 120...
Страница 47: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 47 Air supply...
Страница 48: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 48 Filter...
Страница 49: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 49 Pump priming kit...
Страница 50: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 50 Hopper...
Страница 74: ...Disassembly Re assembly of the 7000 motor 582108110 EN indG Pompe Azur 52C225 docx 74 Remove the motor hood...
Страница 143: ...Disassembly Re assembly of the 7000 motor 582108110 EN indG Pompe Azur 52C225 docx 143 Manually re enter the motor shaft...
Страница 167: ...Pneumatic Wiring 582108110 EN indG Pompe Azur 52C225 docx 167 Indirect air control...
Страница 177: ...Operations Dismantling Reassembling the C225 Fluid section 582108110 EN indG Pompe Azur 52C225 docx 177 Remove the cover...
Страница 209: ...Operations Dismantling Reassembling the C225 Fluid section 582108110 EN indG Pompe Azur 52C225 docx 209 Put the cover on...
Страница 214: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 214...
Страница 215: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 215...
Страница 224: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 224 19 3 Spare Parts Product Filter 3 4 Model 500 bar 7252 psi...