Security devices
Attention
Guards (motor cover, coupling guard, housings, …) are
set up for safe use of the equipment.
The manufacturer can not be held responsible for any
bodily injury as well as failures and / or damage to the
equipment resulting from the destruction, the
occultation or the total or partial removal of the
protectors.
Never exceed the maximum working pressures of the
equipment components.
Danger of Pressure
Safety requires that a decompressed air shutoff valve be mounted on
the pump motor supply circuit to allow trapped air to escape when the
supply is shut off.
Without this precaution, the residual air from the engine may cause the
motor pump to operate and cause a serious accident.
Similarly, a
product purge valve
must be installed on the product circuit
so that it can be purged (after shutting off engine air and
decompressing it) before any intervention on the equipment. These
valves should remain closed for air and open for the product during the
procedure.
Содержание 64350225130000
Страница 41: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 41 8 Equipment plans Pump 52C225...
Страница 42: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 42 Wall mounted pump...
Страница 43: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 43 Pump 52C225 Cart...
Страница 44: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 44 Pump 52C225 Cart Hopper...
Страница 45: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 45 Fluid section C225...
Страница 46: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 46 Motor 7000 Stroke 120...
Страница 47: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 47 Air supply...
Страница 48: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 48 Filter...
Страница 49: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 49 Pump priming kit...
Страница 50: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 50 Hopper...
Страница 74: ...Disassembly Re assembly of the 7000 motor 582108110 EN indG Pompe Azur 52C225 docx 74 Remove the motor hood...
Страница 143: ...Disassembly Re assembly of the 7000 motor 582108110 EN indG Pompe Azur 52C225 docx 143 Manually re enter the motor shaft...
Страница 167: ...Pneumatic Wiring 582108110 EN indG Pompe Azur 52C225 docx 167 Indirect air control...
Страница 177: ...Operations Dismantling Reassembling the C225 Fluid section 582108110 EN indG Pompe Azur 52C225 docx 177 Remove the cover...
Страница 209: ...Operations Dismantling Reassembling the C225 Fluid section 582108110 EN indG Pompe Azur 52C225 docx 209 Put the cover on...
Страница 214: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 214...
Страница 215: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 215...
Страница 224: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 224 19 3 Spare Parts Product Filter 3 4 Model 500 bar 7252 psi...