6
Tel: 886.909 602 109 Email: [email protected]
Content
2.1. Pre-operation Preparation
2.1.1. Environmental Requirements
2.1.2. Power Supply Requirements
2.1.3. Electro-Static Discharge (ESD)
3.2.1. Return Loss/VSWR Measurement
..................................................................................................