29
SALICRU
avoid any problem, as minimum in the first commissioning.
Ŗ
If inductive loads with big inrush current apart from sensi-
tive ones are required to be connected like laser printers or
CRT monitors, keep in mind the start inrush currents of these
peripherals in order to avoid that the equipment becomes
blocked under the worst conditions.
It is better to not connect the loads of this kind, due to the high
quantity of energy resources that take from the UPS.
Содержание SLC TWIN RT series
Страница 2: ......
Страница 49: ...49 SALICRU...
Страница 50: ...50 USER MANUAL...
Страница 51: ...51 SALICRU...