15
4.2. DEFINITION OF THE PRODUCT.
4.2.1. UPS and battery module nomenclature.
SLC-4+1/6-ADAPT2 60X R P2LBDS B1 0/36AB165 COW EE666502
MB ADAPT2 3A-0/2x36AB165 100A COW EE666502
EE* Special customer specifications.
W
Private-label device.
CO Marking “Made in Spain” in UPS and packaging (for customs).
165 Last three digits of the battery code.
AB Letters of the battery family.
36
Number of batteries in a single branch. For common battery set,
all of them will be indicated in the system.
0/
Device ready for backup or batteries requested.
B1 UPS or cabinet with external batteries.
S
Ambient temperature sensor.
D
Transient protection filter.
B
Independent bypass line.
Input-output configuration, three-phase-three-phase.
L
Input-output configuration, single-phase-single-phase.
M
Input-output configuration, single-phase-three-phase.
N
Input-output configuration, three-phase-single-phase.
2
Number of UPSs in parallel.
P
Parallel kit (material for paralleling UPSs or cabinets).
R
In sub-rack format (not integrated inside cabinet).
Y
IP20 protection rating with open door and keyless lock.
X
Sub-family of the ADAPT series (2U modules)
60
Maximum power installable in UPS or in cabinet, in kVA.
ADAPT2 UPS Series.
6
Maximum number of modules installable in UPS or in cabinet.
+1/ Redundant modules. Disregard if none.
4
Number of factory modules installed, except redundant ones.
SLC Acronym abbreviation brand.
CF
Frequency converter 50/60 or 60/50 Hz.
EE* Special customer specifications.
W
Private-label device.
CO Marking “Made in Spain” in UPS and packaging (for customs).
100A Protection size.
165 Last three digits of the battery code.
AB Letters of the battery family.
36 Number of batteries in a single branch
*x
Number of parallel battery branches. Disregard for one.
0/
Device ready for backup or batteries requested.
A
Cabinet type (A: AM262; B: AM261; C: AM263; D: AM264)
3
Number of cabinets in the battery configuration.
ADAPT2 UPS Series.
MB Battery module.
(B1)
The device is supplied without batteries and without the accessories (screws and electric cables). Predictably the batteries
will be installed in an external cabinet or rack. On request, the cabinet or rack and the necessary accessories can be supplied.
For equipment ordered without batteries, their acquisition, installation and connection will always be borne by the customer and
under their responsibility
.
However, our T.S.S
.
may be required to intervene in order to carry out the necessary installation
and connection work. The data concerning the batteries in terms of number, capacity and voltage are indicated on the battery
label attached alongside the device rating plate;
strictly observe
these data and the connection polarity of the batteries.
For devices with an independent static bypass line, a galvanic isolation transformer must be inserted between any two power
lines of the UPS (rectifier input or static bypass) to prevent direct connection of the neutral of the two lines through the internal
connection of the device. This applies only when the two power lines come from two different networks, such as:
- Two different electricity companies.
- An electricity company and a power generator, etc.
SLC ADAPT 2
- UNINTERRUPTIBLE POWER SUPPLY SYSTEM
-
USER MANUAL
Содержание SLC ADAPT2 Series
Страница 1: ...SLC ADAPT2 UNINTERRUPTIBLE POWER SUPPLY USER MANUAL...
Страница 41: ...41 SLC ADAPT 2 UNINTERRUPTIBLE POWER SUPPLY SYSTEM USER MANUAL...
Страница 62: ...62 SALICRU...
Страница 63: ...63 SLC ADAPT 2 UNINTERRUPTIBLE POWER SUPPLY SYSTEM USER MANUAL...