6105
6105
6105
6105 Belt
Belt
Belt
Belt Feeder
Feeder
Feeder
Feeder integrator
integrator
integrator
integrator
---
---
---
--- User
User
User
User’’’’s
s
s
s Guide
Guide
Guide
Guide ---
---
---
---
66
5.3
Installation
Installation
Installation
Installation
5.3.1
5.3.1
5.3.1
5.3.1
Mechanical
Mechanical
Mechanical
Mechanical Part
Part
Part
Part Installation
Installation
Installation
Installation
Comply with the following guidance for installation of the speed sensor.
1.
The N60 speed sensor must be mounted on a belt-driven pulley to ensure an accurate belt-travel
readout. In most applications, the conveyor tail pulley, bend pulley or
snubbing roll is the ideal
location. If it is not suitable to install the speed sensor directly on the tail pulley or bend pulley, an
special roller must be used to mount the N60 speed sensor.
Note: Do not mount the N60 speed sensor on the drive pulley.
2.
In case that a special roller is applied to mount the N60 speed sensor, the following guidelines must
be observed.
1)
The selected roller should have suitable diameter. The rotary speed of the pulley should be kept
within the detection range of the N60 speed sensor.
2)
The roller should be mounted at the clean area of the return belt to minimize material build-up on
the roller.
3)
The roller installed in this way should have the contact surface inclined at an angle of at least 30
degrees, because any slippage between the belt and the roller may cause reduced accuracy of the
belt scale.
3.
To keep freely floating movement, the speed sensor should be flexibly jointed to the conveyor frame
by performing the following steps.
1)
Provide a protruding shaft end with 32mm exterior diameter. Directly insert the sleeved speed
sensor into it, alternatively insert the speed sensor (12.8mm dia.) into the coupling sleeve, then
tighten the bolt.
2)
Use two M8X30 bolts to fasten the anti-rotate arm to the N60 speed sensor. A support plate should
be welded on the conveyor frame for placing the anti-rotate arm on it parallelly. Then fasten an end
of the spring into the round hole at the tail of the anti-rotate arm. And the other end of the spring
should be connected to the conveyor frame. The spring should be lightly tensioned when
installation.
5.3.2
5.3.2
5.3.2
5.3.2
Electrical
Electrical
Electrical
Electrical Part
Part
Part
Part Installation
Installation
Installation
Installation
Go through the following steps to perform electrical installation:
1.
Remove the cover of the terminal block and dust plug of the interior conduit on the speed sensor.
2.
Connect a 12mm conduit to the speed sensor cover.
3.
Route a 2-conductor cable into the speed sensor cover through the conduit.
4.
Perform wiring and replace the cover of the terminal block.
Note: The three leads of the speed sensor should be shieled when wired to the integrator. The shielded
cable should be RVVP2X0.2 or the equivalent. And the shielded line should only be connected to
the interator end (not to the speed sensor end).