This document and all copies are the property of Spider
®
. All dimensions and data are indicative only.
The user must ensure that the equipment complies with local rules and regulations.
Document No: 721641-1
Revision: A
Issue Date: 2017-Dec-18
Page 29 of 38
= Inspect
= Verify
= Perform process
9. DE-REEVING
a) r
emoving
the
P
rimary
S
USPenSion
W
ire
r
oPe
For hoists equipped with a secondary wire rope, the secondary wire rope must be removed before
the primary wire rope is removed.
WARNING
To prevent platform from tipping and avoid injuries, ensure that the platform is properly
supported on a flat, stable surface before putting slack on the primary suspension wire rope.
Verify that platform is supported by a flat, stable surface before putting slack on the primary
suspension wire rope.
Push in the ↓DOWN operation button to wind the primary suspension wire rope out of the hoist.
When the wire rope stops moving, pull the wire rope upward out of the hoist.