Car lift installation, operation and maintenance manual Type
:
4SF-4000B
9
Main beam 1 piece (no gap) Vice beam 1 piece(gap)
<6>:
Remove the screw of the main bridge plate under the package and the packing frame,remove the packing frame. Take H: main bridge plate
with the lifting equipment and move to the free space
Main bridge plate 1 piece
Step 6
:
Determine the machine installation layout
:
Mark the standing points of the four posts with tape measure and chalk, make sure the two diagonals are the same length.