Car lift installation, operation and maintenance manual Type
:
4SF-4000B
6
2.3Main structure of the machine
1.Main Column 2.Sub Column 3.Control box 4. Power unit optional 5.Column cap 6.Approach spans
7.Main beam 8.Vice beam 9.Main bridge 10.Sub slab bridge 11.Length adjustable rolling jack
INSTALLATION
3.1Before installation
3.1.1 Tools and equipments needed
1.Lifting equipment 1 piece, 2.Antiwear hydraulic oil 10L,3.Electric drill,4.chalk,5.Tape,6.Magnet sag,7.
Ф
15mm horizontal pipe 8 m ,8.Open
spanner 1 set,9.Inner hexagon spanner 1 set
10.A cross screwdriver ,11.An one word screwdriver,12.A needle nose pliers, 13.
Ф
17,
Ф
19,
Ф
22 Socket wrench each 1,14,Hammer 1 pieces (4
pounds),15.Circlip pliers 1 piece
3.1.2 Ground requirement
The car lift must be installed on the concrete ground level strong, concrete strength is more than 3000psi, the error is less than 5mm, the
minimum thickness of not less than 300mm. in the new pouring concrete need maintenance 20 days above.
3.1.3
Check accessories
Open the package and check for missing parts in accordance with attachment 1 (complete machine packing list). Once found, contact the
distributor or the manufacturer immediately. If leakage is found, installation is still performed,SAFE and distribute shall not be held responsible
and shall not be settled free of charge.
b
e
a
m