26
English
7.6
First start-up of the
vending machine
Supply the vending machine (following the instructions given
previously) and plug it into the power supply (see 5.9).
At this point the message “CRISTALLO 600/CRISTALLO
400” will be displayed and the self-configuration is enabled
which controls all the previously defined settings, such as:
- the presence of the TIMEKEEPER;
- the correct position of the dispensing arm.
Any faults detected during the self-configuration cycle are
stored so that the vending machine can display them at the
end of the self diagnostic phase.
Adjust grinding as instructed in 7.3; the boiler must be
necessarily filled.
7.7
Filling the boiler
manually
Manual filling of the boiler is required during the first start-
up of the vending machine.
After switching on the vending machine it is possible to fill
the boiler following one of the following procedures:
a) - press the
P2
key (Fig. 41) to enter the maintenance
menu;
- press the “
e
” key (
PRESELECTION
- Fig. 40)
followed by the UP key (
+
- Fig. 40) to access the
RINSING entry;
- press the “
e
” key (
PRESELECTION
- Fig. 40) to
carry out the automatic complete rinsing cycle.
b) - press the
P2
key (Fig. 41) to enter the maintenance
menu;
- press the “
e
” key (
PRESELECTION
- Fig. 40)
followed by the UP key (
+
- Fig. 40) to access the
RINSING entry;
- press the keys
1
,
2
,
3
,
4
, etc. (beverage keys) to
perform the rinsing cycle of any single circuit.
c) - press key 1 (Fig. 41) to enter the programming menu;
- press the P1 and P2 keys simultaneously (Fig. 41) on
the CPU card to carry out the rinsing.
Important
The rinsing operation must be repeated until water flows out
of the brewing nozzles regularly.
7.8
Use of the vending
machine
Important
The instructions for use are shown on the plate on the front of
the vending machine.
The beverage selection procedures are shown in section 9.
Содержание CRISTALLO 400
Страница 63: ...63 English...
Страница 64: ...Cod 15001063 Ed 00 03 07...