101
English
• ON/OFF POST-TREATMENT DIAGRAMS
2-STAGE POST-HEATING
- HYDRONIC COILS
- 2 POST-HEATING STAGES WITH 230 Vac ON/OFF EX-
TERNAL VALVES
2-STAGE POST-HEATING
- ELECTRIC HEATERS
- 2 POST-HEATING STAGES WITH 230 Vac ON/OFF
EXTERNAL ELECTRIC HEATERS (POWER ON 230Vac
SIGNAL)
HYDRONIC POST-TREATMENT
- POST-COOLING WITH 230 Vac ON/OFF EXTERNAL
VALVE
- POST-HEATING WITH 230 Vac
ON/OFF EXTERNAL VALVE
HYDRONIC POST-COOLING
- POST-COOLING WITH 230 Vac ON/OFF EXTERNAL
VALVE
F
M22
M20
M21
M4
M3
M2
M1
POWER
BOARD
F2
F1
FAN1
N
L
L
FAN2
N
EH1
M5
A0
C1
0
230VAC
C3
C3
C1
1
8
KD2
5
4
6
7
ON
5
6
2
3
3
4
ON
KD1
ON
1
2
ON
2
ON
1
MC1
DL1
ON
KD3
M7
M6
FC-FC
22
23
Q2
21 20
Q3
HEAT
VALVE
ACTUATORS
230Vac
ON-OFF Type
N
E
N
HEAT
E
1° Stage
2° Stage
2
3
7
ON
5
KD1
8
4
6
1
DIP4 = ON
ON
F
M22
M20
M21
M4
M3
M2
M1
POWER
BOARD
F2
F1
FAN1
N
L
L
FAN2
N
EH1
M5
A0
C1
0
230VAC
C3
C3
C1
1
8
KD2
5
4
6
7
ON
5
6
2
3
3
4
ON
KD1
ON
1
2
ON
2
ON
1
MC1
DL1
ON
KD3
M7
M6
FC-FC
22
23
Q2
21 20
Q3
POWER SUPPLY
230Vac
N
L
N
N
R1
N
N
L
N
R1
POWER SUPPLY
230Vac
2° Stage
1° Stage
2
3
7
ON
5
KD1
8
4
6
1
DIP4 = ON
ON
F
M22
M20
M21
M4
M3
M2
M1
POWER
BOARD
F2
F1
FAN1
N
L
L
FAN2
N
EH1
M5
A0
C1
0
230VAC
C3
C3
C1
1
8
KD2
5
4
6
7
ON
5
6
2
3
3
4
ON
KD1
ON
1
2
ON
2
ON
1
MC1
DL1
ON
KD3
M7
M6
FC-FC
22
23
Q2
21 20
Q3
COOL
N
VALVE
ACTUATORS
230Vac
ON-OFF Type
E
HEAT
E
N
2
3
7
ON
5
KD1
8
POST=ALL
4
6
1
DIP4 = ON
DIP5 = ON
ON
F
M22
M20
M21
M4
M3
M2
M1
POWER
BOARD
F2
F1
FAN1
N
L
L
FAN2
N
EH1
M5
A0
C1
0
230VAC
C3
C3
C1
1
8
KD2
5
4
6
7
ON
5
6
2
3
3
4
ON
KD1
ON
1
2
ON
2
ON
1
MC1
DL1
ON
KD3
M7
M6
FC-FC
22
23
Q2
21 20
Q3
N
COOL
E
VALVE
ACTUATOR
230Vac
ON-OFF Type
1
2
ON
ON
3
4
5
6
7
8
KD1
DIP4 = ON
DIP5 = ON
POST=COOL
Содержание ENERGY SHP-270
Страница 20: ...20 Italiano Installazione del comando a muro 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56...
Страница 61: ...61 Italiano NOTE...
Страница 78: ...78 English Installing control on the wall 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56...
Страница 119: ...119 English NOTE...
Страница 123: ...123...