12
11.
Disassemble each handrail as shown in FIGURE G. Insert the two handrails into the holes on the
top of the slide runway rails, and rotate so that the rails are resting in the grooves on the back
side of the entrance section. Secure each handrail into the socket using a (#10) Flat Washer, a
(#11) Lock Washer, and a (#12) Hex Nut. Use Loctite® 242 Thread Locking Compound on all
handrail fasteners.
12.
Starting with the top handrail spacer, align the top hole in the handrail with the top hole in the
ladder side rail. Next, assemble the handrail spacer parts (#7), (#8) and (#9) in the order shown
in FIGURE G and align it between the handrail and ladder top holes. Next, insert the (#6) 1/4-20
x 8” Carriage Bolt through the handrail and the handrail spacer parts. The (#13) Ladder spacer is
to be placed in the inside channel of the ladder side rail such that the (#6) Carriage Bolt holds it in
place after it is pushed completely through the ladder side rail, see FIGURE H. Secure the (#6)
Carriage bolt using a (#10) Flat Washer, a (#11) Lock Washer, and a (#12) Hex Nut in the order
shown in FIGURE G and FIGURE H. Use Loctite® 242 Thread Locking Compound on all
handrail fasteners.
FIGURE G
8,
7,
9,
13,
10,
11,
6
5
5
8,
7,
9,
10,
11,
12
8,
7,
9,
10,
11,
12
10
11
12
Содержание rogue2
Страница 7: ...7 24 25...
Страница 21: ...A APPENDICES ROGUE2 SLIDE FOOTPRINT Right curve shown left curve is mirror image...