background image

12 

 

11. 

Disassemble each handrail as shown in FIGURE G.  Insert the two handrails into the holes on the 
top of the slide runway rails, and rotate so that the rails are resting in the grooves on the back 
side of the entrance section.  Secure each handrail into the socket using a (#10) Flat Washer, a 
(#11) Lock Washer, and a (#12) Hex Nut.  Use Loctite® 242 Thread Locking Compound on all 
handrail fasteners. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

12. 

Starting with the top handrail spacer, align the top hole in the handrail with the top hole in the 
ladder side rail.  Next, assemble the handrail spacer parts (#7), (#8) and (#9) in the order shown 
in FIGURE G and align it between the handrail and ladder top holes.  Next, insert the (#6) 1/4-20 
x 8” Carriage Bolt through the handrail and the handrail spacer parts.  The (#13) Ladder spacer is 
to be placed in the inside channel of the ladder side rail such that the (#6) Carriage Bolt holds it in 
place after it is pushed completely through the ladder side rail, see FIGURE H.  Secure the (#6) 
Carriage bolt using a (#10) Flat Washer, a (#11) Lock Washer, and a (#12) Hex Nut in the order 
shown in FIGURE G and FIGURE H.  Use Loctite® 242 Thread Locking Compound on all 
handrail fasteners. 

 

FIGURE G

 

8,

 

7,

 

9,

 

13,

 

10,

 

11,

 

6

 

5

 

5

 

8,

 

7,

 

9,

 

10,

 

11,

 

12

 

8,

 

7,

 

9,

 

10,

 

11,

 

12

 

10

 

11

 

12

 

Содержание rogue2

Страница 1: ...ARTERS P O Box 400 1017 S W Berg Parkway Canby Oregon 97013 USA Phone 503 266 2231 Fax 503 266 4334 www srsmith com S R SMITH ROGUE2 SLIDES ARE MANUFACTURED FOR INSTALLATION AND USE ON RESIDENTIAL ING...

Страница 2: ...NG INSTRUCTIONS 15 IN DECK MOUNTING INSTRUCTIONS 16 SLIDE PLUMBING INSTRUCTIONS 17 GARDEN HOSE ADAPTOR INSTALLATION INSTRUCTIONS 18 ELECTRICAL BONDING 18 MANUFACTURER S PLACEMENT INSTRUCTIONS 19 APPEN...

Страница 3: ...MENTS FOR SIZE OF CONCRETE FOOTING OVERALL HEIGHT OF SLIDE AND BODING OR ELECTRICAL CODES CHECK INSIDE ALL BOXES AND PACKAGING MATERIALS FOR PARTS BEFORE BEGINNING ASSEMBLY READ ALL INSTRUCTIONS AND I...

Страница 4: ...l equipment should be at least 3 6 1 067 M 6 Observe the position of the exit of the slide as shown in FIGURE O FIGURE P and FIGURE R on pages 19 and 20 MAINTENANCE INSTRUCTIONS 1 When hosing down the...

Страница 5: ...5 ASSEMBLED ROGUE2 LAYOUT ROGUE 2 right curve slide shown left curve is mirror image of right curve See Appendices for additional slide layout details FIGURE A...

Страница 6: ...r Spacer 2 ea 14 3 8 16 X 5 B H C S 18 8 S S FULL THREAD TT 2 ea 15 HHCS 3 8 16 X 3 5 S S 2 ea 16 3 8 x 3 5 Button Head Cap Screw S S 4 ea 17 3 8 Flat Washer S S 16 ea 18 3 8 Lock Washer S S 8 ea 19 3...

Страница 7: ...7 24 25...

Страница 8: ...e that will not scratch the slide TIP Use flattened Rogue2 box to help protect slide from scratches during assembly a Ensure the gaskets installed at the factory are still in place Any damaged gasket...

Страница 9: ...The two short legs go into the front sockets nearest the slide exit b The shorter of the two longer legs goes into the socket on the inside curve of the slide c Be sure to insert the end of the legs t...

Страница 10: ...r a Make sure that the slide entrance is level from side to side while maintaining a height of 77 1 2 1 9558 M 12 7 mm from the deck level and a ladder angle of 15 deg 0 262 rad with respect to the ve...

Страница 11: ...runway surface horizontally from side to side using a small level The exit end height should be maintained at 7 0 178 M between the bottom of the slide and the deck see FIGURE A 10 The legs can be adj...

Страница 12: ...rail Next assemble the handrail spacer parts 7 8 and 9 in the order shown in FIGURE G and align it between the handrail and ladder top holes Next insert the 6 1 4 20 x 8 Carriage Bolt through the hand...

Страница 13: ...12 Use a 5 1 4 20 x 6 Carriage Bolt along with a 10 Flat Washer a 11 Lock Washer and a 12 Hex Nut to fasten the parts together as shown in FIGURE G and FIGURE H Place 25 Vinyl Cap over the exposed thr...

Страница 14: ...uminum Flange Anchor 4 ea 2 05 162 5 16 18 UNC x 2 3 4 STUD w FLAT WASHER LOCK NUT 16 ea 3 05 14 123 1 4 20 UNC x 2 3 4 HHCS 4 ea 4 04 14 111 1 4 ID x 5 8 OD FLAT WASHER 8 ea 5 05 14 117 1 4 20 UNC HE...

Страница 15: ...ashers 7 5 16 Lock Washers and the 2 5 16 18UNC Hex Nuts 6 Using the center holes on each ladder foot as templates mark the hole locations on the deck Next drill holes 5 16 22 2 mm diameter by 2 1 4 i...

Страница 16: ...ladder steps are level from side to side and the ladder is held at 15 degrees 0 26 radians from vertical 12 Secure the slide to prevent the movement during the concrete pour to ensure that the slide...

Страница 17: ...step for each tread on ladder 2 Install the 2 PVC 90 Elbow fitting onto one end of the PVC flex hose using PVC glue Next apply glue to the male end of the 2 Elbow fitting and the female fitting that...

Страница 18: ...y assembled as explained in the Rogue2 Installation Instructions Next apply PVC glue around the end of the garden hose adapter indicated by the arrow in FIGURE M 2 After the glue is applied quickly in...

Страница 19: ...FIGURE O 2 A minimum clearance area in front of the slide shall be maintained at all times as follows A A minimum clearance area in front of the slide shall be maintained away from the coping another...

Страница 20: ...contained in ANSI APSP ICC 5 2011 STANDARD FOR RESIDENTIAL INGROUND SWIMMING POOLS and refer to FIGURE 3 and Table 1 for Minimum Water Envelope Dimensions AB BC and Width at Point C TABLE 1 Board Mini...

Страница 21: ...A APPENDICES ROGUE2 SLIDE FOOTPRINT Right curve shown left curve is mirror image...

Отзывы: