4
INSTALLED ROGUE2 STRUCTURAL & INSTALLATION CHECKLIST
Installer to review with slide owner upon completion of slide installation.
1.
Inspect the runway for visible cracks or tears.
2.
Inspect the ladder for sharp edges, protrusions, cracks, or tears.
3.
Inspect all fasteners to make sure they are fully tightened.
4.
Inspect the ladder for rigidity and attachment.
5.
Measure the following dimensions and compare with the manufacturer’s placement instructions on
page 19.
Pool water depth at the base of the slide should be at least 3’ (914 mm) deep, and at 4’6”
(1.372 M) out from slide exit, should be at least 4’6” (1.372 M) deep.
The height of the slide runway exit above the water should be 20” (0.508 M) maximum.
The distance between the slide centerline and the edge of other pool equipment should be at
least 3’6” (1.067 M).
6.
Observe the position of the exit of the slide as shown in FIGURE O, FIGURE P, and FIGURE R on
pages 19 and 20.
MAINTENANCE INSTRUCTIONS
1.
When hosing down the deck, hose your Rogue2 to wash away any dust, dirt or other debris, which
may have accumulated.
2.
Be sure that all connections are secure. Tighten hardware if necessary.
3.
All polyethylene parts require little maintenance. Hose and wipe to clean.
While cleaning slide, check and see that all nuts and bolts are tight and secure.
4.
Inspect the runway for visible cracks or tears, sharp edges and protrusions.
5.
Inspect all attachment points for loose or corroded fasteners.
6.
Inspect all ladder tread or step-attachment points for evidence of shear, bending yield, or fatigue in
the ladder steps, rails, or attachments means. Yield is evidenced by crystallization or fine cracking of
the ladder tread and/or surface.
7.
Inspect the ladder handrails for rigidity and attachment.
Содержание rogue2
Страница 7: ...7 24 25...
Страница 21: ...A APPENDICES ROGUE2 SLIDE FOOTPRINT Right curve shown left curve is mirror image...