TIPS:
• Make sure to use Anti-Seize on all bolts.
• Be careful not to allow dirt to get into the water delivery system on the entry section.
• Gasket end of each flume section goes downhill.
• The Entry Frame Support bolts to the inside of the Entry Section. There are three 3/8” bolts, one
on each side, and one in the center.
• Anchor supports attach to the down slope side of the flange. (Fig. 3)
• Each flange has 7 bolts (Kit BYOS2-102-SS). All bolts are 3/8” x 1-3/4”. Use Anti-Seize (in
BYOS2-101-SS) on all bolts.
• Insert bolts in this order: bolt, flat washer, flanges, flat washer, lock washer, nut. On flanges that
require anchor supports insert bolts in this order: bolt, flat washer, flanges, anchor support, flat
washer, lock washer, and nut.
• Insert and hand tighten all seven flange bolts. Then, utilizing a torque wrench, tighten each nut to
approximately half of the maximum 25 ft. lbs. Tighten the blots in an alternating fashion working
from left to right starting with the center bolt, working your way up the flange (Fig. 3). Repeat this
same tightening process until the specified 25 ft lbs is reached on each bolt. Do not over tighten.
Using greater force may fracture the fiberglass. Tightening the bolts in this sequence is necessary
to compress the gasket evenly.