background image

Assembly Instructions

®

MATERIAL HANDLING CART

®

Step 12:

Slide in the adjustable side arms to 

one of two positions. Pull down on the 

spring-loaded pin to allow movement. 

(Note: Outer position of the side arms 

will allow 4’ wide material such as wall 

board to be centered on the cart.)

Note: Assembly sequence requires 

lifting and positioning heavy 

components. Procedure may 

require two people. 

Parts Included:

Frame tubes 

4

Axle frames 

3

End handle section 

2

8” Casters 

6

Adjustable side arms 

4

Fasteners:

1/2” U Bolts 

20

1/2” Flat washers 

40

1/2” Lock washers 

           40

1/2” Hex nuts 

40

3/4” x 2” Bolts 

2

3/4” Lock nuts 

2

3/8” x 1” Bolts 

24

3/8” Lock nuts 

24

5/16” Flat washers 

48

Assembly Instructions

Model 2721

7251 So. 42nd St.

Grand Forks, ND 58201

1.800.441.0551

www.telproinc.com

®

MATERIAL HANDLING CART

Thank you

 

for choosing one of Telpro’s great products!

Form 42-15-00-00.12-2-02 

© 2019 Paragon Pro Manufacturing Solutions All Rights Reserved.

MATERIAL HANDLING CART

®

®

®

®

®

®

®

®

Отзывы: