Assembly Instructions
®
MATERIAL HANDLING CART
®
Step 12:
Slide in the adjustable side arms to
one of two positions. Pull down on the
spring-loaded pin to allow movement.
(Note: Outer position of the side arms
will allow 4’ wide material such as wall
board to be centered on the cart.)
Note: Assembly sequence requires
lifting and positioning heavy
components. Procedure may
require two people.
Parts Included:
Frame tubes
4
Axle frames
3
End handle section
2
8” Casters
6
Adjustable side arms
4
Fasteners:
1/2” U Bolts
20
1/2” Flat washers
40
1/2” Lock washers
40
1/2” Hex nuts
40
3/4” x 2” Bolts
2
3/4” Lock nuts
2
3/8” x 1” Bolts
24
3/8” Lock nuts
24
5/16” Flat washers
48
Assembly Instructions
Model 2721
7251 So. 42nd St.
Grand Forks, ND 58201
1.800.441.0551
www.telproinc.com
®
MATERIAL HANDLING CART
Thank you
for choosing one of Telpro’s great products!
Form 42-15-00-00.12-2-02
© 2019 Paragon Pro Manufacturing Solutions All Rights Reserved.
MATERIAL HANDLING CART
®
®
®
®
®
®
®
®