STEP 4: 20˚ ANCHOR INFORMATION
The following information is for the River Run 20˚ anchor and should be reviewed before proceeding onto the next
step. Our 20˚ anchor is designed to allow easier use with concrete tube forms.
The length of our River Run flume anchors allow room for concrete chutes when using concrete tube forms in a
River Run installation. This anchor design will provide more flexibility in installation options and make your River Run
installations even easier. (Fig. 14)
24”
Concrete
Embedment
Depth 24”
FIG. 14
STEP 5: MOVE THE SLIDE
Once the entire slide is assembled and resting on the anchor supports in its correct horizontal position on the
pathway, use spray paint to carefully mark the location of the anchor supports. Next, with sufficient manpower,
gently move the assembled slide (if possible) approximately 3 feet to one side.