background image

WARNING:

IMPORTANT INSTALLATION

INFORMATION

The installation of this product should be done only by a licensed and professional installer. 

Installation should be done strictly in conformance with all local building codes, electrical 

codes and other building and safety laws and regulations. Among other things, that your 

installer should carefully analyze the need to bond the product to prevent an electrical 

hazard. Failure to properly install this product could result in a dangerous condition, including 

but not limited to electrical and or structural hazards. S.R.Smith. disclaims all liability arising 

from the installation and the user assumes all risk associated with the installation.

For Technical Support or Assistance, Contact Customer Service at:

Canby, Oregon | 800.824.4387

Tucson, Arizona | 800.737.5386

srsmith.com

For warranty information:

srsmith.com/warranty

To obtain complete copies of the ANSI/APSP/ICC-5 2011 Standard for Residential  

In-ground Pools or to obtain copies of the “Plan Your Dive, Steer Up” or  

“The Sensible Way to Enjoy Your In-ground Swimming Pool” contact:

The Association of Pool & Spa Professionals (APSP)

2111 Eisenhower Ave.

Alexandria, VA 22314

(703) 838-0083

www.theapsp.org

WARNING

Содержание River Run Slide 19A

Страница 1: ...4A STYLE 24B STYLE 29A STYLE 23A SBK RR INSTALL 0419 RIVER RUN SLIDE ASSEMBLY INSTALLATION INSTRUCTIONS S R Smith LLC Canby Oregon 800 824 4387 Tucson Arizona 800 737 5386 srsmith com Copyright 2019 S R Smith All rights reserved ...

Страница 2: ...ing but not limited to electrical and or structural hazards S R Smith disclaims all liability arising from the installation and the user assumes all risk associated with the installation For Technical Support or Assistance Contact Customer Service at Canby Oregon 800 824 4387 Tucson Arizona 800 737 5386 srsmith com For warranty information srsmith com warranty To obtain complete copies of the ANSI...

Страница 3: ...ing Started 6 Tools Required 7 Assembly and Installation Instructions Step 1 Preparing Site Area 7 Step 2 Flume Assembly 7 8 Step 3 Entry Section Anchor Assembly 9 10 Step 4 River Run 20 Anchor Information 11 Step 5 Move the Slide 11 Step 6 Excavate the Holes 12 Step 7 Reset Slide in Position 12 Step 8 Final Slide Position 13 15 Step 9 Pour Concrete Piers 15 Step 10 Connect Water Supply 15 Flume A...

Страница 4: ...hang of 3 and should be supported at the fiberglass landing plate Zoom Flume water delivery system requires a 1 PVC flex hose For best performance the recommended water flow at the slide is 20 40 GPM Connecting a ball valve in line is recommended for water flow adjustment NOTE Connect the Zoom Flume water delivery system to water source and test for leaks or defects prior to final assembly install...

Страница 5: ...n result in serious injury or death for one or both persons Before sliding always make sure that the path in front of the slide is free from any including submerged obstructions including other people or objects in the pool such as rafts inner tubes etc When a diving board is also present make sure you do not use the slide while someone is on or using a diving board Take turns 14 No roughhousing o...

Страница 6: ...which increases to a depth of four feet six inches 4 6 at point A which is located four feet six inches 4 6 from the back wall of the pool A minimum depth of four feet six inches 4 6 must be maintained at a distance of nine feet 9 along the centerline of the slide from point A The above described water depth profile shall extend a minimum of three feet six inches 3 6 on either side of the centerli...

Страница 7: ...curve Pivot A has to be at the pool edge Refer to Diagram D E below If the slide meets the pool edge straight on then the end of the exit section should be parallel with the pool edge Refer to Diagram F below NOTE The exit point of the flume can be no higher than 20 above the water DIAGRAM D NOTTO SCALE DIAGRAM E NOTTO SCALE DIAGRAM F NOTTO SCALE 3 MINIMUM OVERHANG 3 MINIMUM OVERHANG 3 MINIMUM OVE...

Страница 8: ...ommended water flow at the slide is 80 GPM total 40 GPM per side Zoom Flume water delivery system requires a 1 PVC hose NOTE a ball valve in line on each side is recommended for water flow adjustment Do not construct objects or formations along or over the slide pathway that obstruct the pathway for sliders or cause potential bodily harm Minimum recommended head clearance above the slide pathway i...

Страница 9: ...slide pathway To help identify the flume sections for the correct order of assembly there are stickers attached at each flange end of each flume section For example attach the letter A end of the exit section to the letter A end of the next flume section of your River Run slide Fig 2 sample only Attach the anchor supports in the specified locations as you build uphill and away from the pool Sticke...

Страница 10: ...on all bolts Insert bolts in this order bolt flat washer flanges flat washer lock washer nut On flanges that require anchor supports insert bolts in this order bolt flat washer flanges anchor support flat washer lock washer and nut Insert and hand tighten all seven flange bolts Then utilizing a torque wrench tighten each nut to approximately half of the maximum 25 ft lbs Tighten the blots in an al...

Страница 11: ...ight into position as shown Fig 6 7 Using 4 each 3 8 x1 bolts attach the anchor to the entry section Use a flat washer on each side of the part and anchor Pass the bolt through from the outside of part toward the underside and add a lock washer and a nut to each bolt Hand tighten only Attach next flume section after entry and 20 anchor on the downhill side of assembly Attach right and left arms as...

Страница 12: ...in ground or with minimum 18 diameter tube When oriented correctly the bottom of the entry frame support will be level as shown in Fig 11 The vertical portions of the support frame should be plumb level in both axis See Fig 12 13 below NOTE When slide is assembled and leveled as per instructions the bolts on the entry support frame and anchors may be tightened TIP Once all the flume sections are a...

Страница 13: ...hors allow room for concrete chutes when using concrete tube forms in a River Run installation This anchor design will provide more flexibility in installation options and make your River Run installations even easier Fig 14 24 Concrete Embedment Depth 24 FIG 14 STEP 5 MOVE THE SLIDE Once the entire slide is assembled and resting on the anchor supports in its correct horizontal position on the pat...

Страница 14: ...crete grade for correct anchor embedment depth See Fig 14 NOTE It is essential that the vertical portions of the anchors are plumb With the exception of the exit section landing plate Fig 1 make sure that a minimum 3 inch clearance is maintained between any portion of the underside of the slide including the flanges and the substrate Based on the slider s weight and velocity the slide can move sli...

Страница 15: ...stalled correctly is absolutely necessary for a successful installation The exit section must meet the pool edge at the correct elevation in the correct orientation and be level in both axes Fig 16 Fig 17 When determining level position for the exit section please note that the exit section starts with a 20 up slope which then makes a gradual transition to 7 the exit point Check for level position...

Страница 16: ...re correct placement of the entry section the entry frame support must be level to ensure correct orientation of the slide Fig 19 20 The sides of the flumes should be checked for level as well The only place along the flume where level positions can be determined is at the flange gasket locations Place level across the flume at the flume joint as illustrated Fig 21 22 Check each flange location fo...

Страница 17: ... the slide and work down adjust the blocking materials to level the flume from side to side Once the flume is level from side to side re check the position of exit section for alignment and height above water adjust as necessary Repeat this process until the entire slide is correctly positioned STEP 9 POUR CONCRETE PIERS Once the correct horizontal and vertical position of the slide has been estab...

Страница 18: ...exits do not have hardware BYOS2 102 SS FLUME TO FLUME SS HARDWARE KIT QTY PART NUMBER COMPONENT DESCRIPTION 7 H SS 3 8X1 34 3 8 16X1 3 4 Hex Bolt Stainless Steel 14 H SS 3 8 FLT WA 3 8 MS 815 Flat Washer Stainless Steel 7 H SS 3 8 LOC WA 3 8 Lock Washer Stainless Steel 7 H SS 3 8 F NUT 3 8 16 Hex Nut Stainless Steel HARDWARE NOTE Use a small dab of anti seize lubricant included on all bolt thread...

Страница 19: ...not use steel wool wire brushes metal scrapers Scotchbrite or other abrasive sponge pads Keeping your slide s gel coat finish coated with wax starting when the slide is new is the best way to prolong its life Choose a wax intended for use on gel coat surfaces Preferably one designed for use in a Marine environment Test product on small inconspicuouse section of slide prior to full application Whil...

Страница 20: ...INSTALLATION INSTRUCTIONS RIVER RUN SLIDE 18 SBK RR INSTALL 0419 Copyright 2019 S R Smith LLC All rights reserved srsmith com NOTES ...

Отзывы: