Simple Binding Steps
1)
Bind the drooping part of the fibers and twisted pairs of each board, and lead them to both sides of the chassis for
convenience..
2)
On the both sides of the chassis, fasten the fibers and twisted pairs to the cabinet cable management ring or cabling
chute.
3)
For the power cables, you should bind them closely along the bottom of the chassis, in a straight line wherever
possible.
Installation Verification
Verifying the Cabinet
Verify if the external power supply matches the distribution panel of the cabinet.
After installing the equipment, verify if the front/back cabinet doors can be closed.
Verify that the cabinet has been fastened completely, and does not move or tilt.
Verify that the equipment has been installed in the cabinet, and all the cables have been fastened to the cabinet.
Verifying the Cables
Verify that the fibers and twisted pairs match the ports.
Verify that the cables have been bound properly.
Verifying the Power Supply
Verify that the power cables are in good contact and comply with the safety requirements.
Verify that the power module has been fastened onto the equipment with the two captive screws on the panel.
Turn on the power switch and verify that the power module can work normally.
Installing Swappable Interface Modules (Optional)
Installing XFP/SFP+/SFP Modules
To avoid damaging components due to operation errors, read this section carefully before installing
XFP/SFP+/SFP modules.
To install XFP/SFP+/SFP modules, do as follows:
1)
Wear an anti-static wrist trap close to your skin and have it properly grounded.
2)
Take out the XFP/SFP+/SFP module you want to install from the packing bag. Do not touch the module’s edge
connector.
3)
As shown in Figure 3-7, turn up the handle of the module into the top lock. Hold both sides of the module and push
the module into place (You can feel that the top and bottom locks are placed in position).
Figure 3-7 Installing XFP/SFP+/SFP modules