![Rotex Solaris RPS3 P2 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/rotex/solaris-rps3-p2/solaris-rps3-p2_operating-and-installation-manual_1491156011.webp)
3
x
Installation
11
FA ROTEX Solaris RPS3 P2 - 06/2012
3
Installation
3.1
System concepts
ROTEX solar systems are normally installed in accordance with the system concepts shown in the following. This also includes
the possibility of connection on the opposite side of the flat solar panels in each case.
3.2
Installing control and pump unit
The high-output flat solar panels can be mounted on different types of roofs. For more information on
installation of solar panels see:
– Pitched roof V21P/V26P/H26P: on-roof installation instructions for solar panels.
– Flat roof V21P/V26P/H26P: installation instructions for the solar panel flat roof support frame.
– In-roof V21P/V26P: in-roof solar panel installation instructions.
Connection at opposite ends possible
1)
(possible from 1+ solar panels) Same-side installation connection (up to maximum of 3 solar panels)
Fig. 3-1
Two-way connected solar panel field with Sanicube domestic hot
water storage tank (
1)
ROTEX recommends this connection type)
Fig. 3-2
Solar panel with connections on same side with Sanicube hot water
storage tank
WARNING!
Live parts can cause an electric shock on contact and cause fatal burns and injuries.
• Before beginning maintenance work on the boiler control panel or the solar control system, disconnect
them from the power supply (switch off fuse, main switch) and secure against unintentional restart.
• In order to avoid any danger caused by damaged electrical wiring, always have such wiring replaced by
electrical engineers in compliance with valid standards and guidelines as well as the specifications of the
energy supply company.
• Comply with the relevant safety at work regulations.
The pump unit must be connected to the hot water storage tank before it is filled with water.
If the solar system is connected to a hot water storage tank that is already in operation, then the unpressurized
storage tank section must first be drained.
For information about installing the control and pump unit Solaris RPS3 P2 to an older ROTEX domestic hot
water storage tank, please get in touch with Rotex technical customer support.