![Rotex Controller Series Скачать руководство пользователя страница 190](http://html1.mh-extra.com/html/rotex/controller-series/controller-series_product-documentation_1491112190.webp)
EbV
Product documentation THETA NORM/UNIT
15-2
Hydraulic parameters ........................ 6-4
Information temperature .................. 8-60
Legionella protection ....................... 8-35
Legionella protection day ................. 8-18
List of abbreviations ........................... 4-1
Long-time value outside temperature 7-1
MCBA ................................................ 7-2
Malfunction messages ............ 5-39, 11-4
Maximum temperature limit
solid fuel .......................................... 8-51
Mean value outside temperature ....... 7-1
Menu selection level ........................ 5-20
Minimum burner run time ................... 8-4
Minimum running time solar charging
pump (SOP) ..................................... 8-41
Minimum temperature limit
solid fuel boiler ................................. 8-51
Modem function ............................... 8-59
Mounting instructions MS-K ............. 12-6
Mounting instructions
for NORM type ................................. 12-1
Mounting instructions for UNIT type 12-3
Mounting instructions remote unit .... 12-9
Night-time Room Temperature .......... 5-3
Occupation suitable heating ............ 8-24
Operat. hours counter ...................... 8-19
Operating Mode Setting ..................... 5-4
Operating states .............................. 5-13
Optimmization (start) ....................... 8-30
Outdoor sensor 2 ............................... 7-2
Outdoor temp. locking ....................... 8-7
Outside Temperature Measurement .. 7-1
Overview SENSOR ADJ. ................. 5-49
Overview heating circuit .................. 5-44
Parallel heat generator release ....... 8-13
Parameter-Presettings ....................... 6-3
Party mode ........................................ 5-7
Permanent heating operation ............ 5-9
Plant information .............................. 5-11
Primary pump .................................. 8-12
Priority mode ................................... 8-36
Priority-separation circuit ................. 8-37
RED ................................................. 8-21
RELAY TEST Level ......................... 5-49
Raising Return Temperature Level .. 5-46
Reduced Mode ................................ 8-21
Reduced mode ................................ 8-21
Relay Function Test ......................... 11-3
Reset Parameter ............................. 5-35
Reset heat generator ......................... 8-6
Return control .................................. 8-13
Return mix ....................................... 8-13
Room Controller ...............................8-28
Room Influence ................................8-26
Room factor ......................................8-27
Room frost protection limit ...............8-29
Room influence ................................8-26
Room thermostat function ................8-29
Rotary Pushbutton .............................5-2
SENSOR ADJ. Level ........................5-49
SLT test ............................................11-2
Safety temperature limiter ................11-2
Screed function ................................8-24
Sensor Calibration ............................11-7
Sensor Resistance Values ...............14-2
Sensor assignment ............................6-4
Sensor measuring ranges ................14-2
Software date .....................................6-6
Solar Level .......................................5-46
Solar anti-blocking protection ...........8-43
Solar charging pump ........................8-40
Solar density of the medium .............8-42
Solar energy balance .......................8-42
Solar energy balance
of the medium ..................................8-42
Solar forced dissipation valve ..........8-54
Solar inhibition heat generator .........8-41
Solar load switch ..............................8-53
Solar operating mode .......................8-41
Solar panel maximum limit ...............8-41
Solar priority / parallel switchover ....8-41
Solar reset energy balance ..............8-42
Solar switch-off differential ...............8-41
Solar switch-on differential ...............8-40
Solar tank maximum limit .................8-41
Solar volume flow .............................8-42
Solid Fuel Level ................................5-47
Solid fuel boiler pump .......................8-51
Solid fuel inhibition H-GEN ...............8-52
Solid fuel switch-off differential .........8-52
Solid fuel switch-on differential .........8-51
Stage II-WW Loading Mode ...............8-6
Standby mode ..................................5-10
Starting up ..........................................6-1
Summer Mode ....................................5-9
Summer switch-off ................... 5-35, 7-3
Switching differential I ........................8-4
Switching differential II .......................8-4
Switch-off mode ...............................8-21
System frost protection ......................7-4
Tank Discharge Protection ...............8-37
Technical Data .................................14-1
Temperature Limitation ....................8-22
Temperature Rise ............................8-23
Содержание Controller Series
Страница 2: ......
Страница 8: ...EbV Product documentation THETA NORM UNIT VI...
Страница 10: ...EbV Product documentation THETA NORM UNIT 1 2...
Страница 16: ...EbV Product documentation THETA NORM UNIT 2 6...
Страница 18: ...EbV Product documentation THETA NORM UNIT 3 2...
Страница 20: ...EbV Product documentation THETA NORM UNIT 4 2...
Страница 70: ...EbV Product documentation THETA NORM UNIT 5 50...
Страница 78: ...EbV Product documentation THETA NORM UNIT 6 8...
Страница 162: ...EbV Product documentation THETA NORM UNIT 10 10...
Страница 170: ...EbV Product documentation THETA NORM UNIT 11 8...
Страница 192: ...PD_THETA NURS_EbV_GB_0460017001_0612 23...