background image

ACO-2200 User Guide (v5.0)

Contents • i

Contents

Introduction 7

Related Publications ................................................................................................................................................. 7
Documentation Conventions .................................................................................................................................... 7

Interface Elements ................................................................................................................................................. 7
User Entered Text  ................................................................................................................................................. 7
Referenced Guides  ................................................................................................................................................ 7
Menu Sequences .................................................................................................................................................... 7
Important Instructions  ........................................................................................................................................... 8

Contacting Technical Support .................................................................................................................................. 8

Before You Begin 

9

Features .................................................................................................................................................................... 9
Functional Block Diagram ..................................................................................................................................... 10

Hardware Overview 

11

Front Panel Overview  ............................................................................................................................................ 11
Rear Panel Overview  ............................................................................................................................................. 11

Physical Installation 

13

Before You Begin  .................................................................................................................................................. 13

Static Discharge  .................................................................................................................................................. 13
Unpacking ........................................................................................................................................................... 13

Initial Product Inspection  ....................................................................................................................................... 13
Operating Environment Requirements  .................................................................................................................. 13
Rack Mount Installation ......................................................................................................................................... 14

Installing the ACO-2200 into a Rack Unit .......................................................................................................... 14
Installing the Rear Support Brackets    ................................................................................................................ 14

Connecting Power  .................................................................................................................................................. 15
Setting the Initial IP Address  ................................................................................................................................. 15

Configuring the DIP Switches  ............................................................................................................................ 15

Accessories and Options  ........................................................................................................................................ 16

User Documentation ............................................................................................................................................ 16
DC Power Supply Bricks  .................................................................................................................................... 16
Power Cords  ........................................................................................................................................................ 16

Functional Check Procedures 

17

Required Equipment  .............................................................................................................................................. 17
Functional Check Procedure and First Time Operation  ........................................................................................ 17
Initial Power-Up ..................................................................................................................................................... 17

Recommendation ................................................................................................................................................ 18

Using DashBoard  ................................................................................................................................................... 19
Initial Configuration ............................................................................................................................................... 20
Performing Functional Checks  .............................................................................................................................. 21

Normal Operation (No Faults)  ............................................................................................................................ 22
Loss of the Primary Signal .................................................................................................................................. 22
Loss of Power ...................................................................................................................................................... 23

Operational Configuration  ..................................................................................................................................... 23

Power .................................................................................................................................................................. 23
Signals ................................................................................................................................................................. 23

Содержание ACO-2200

Страница 1: ...ACO 2200 User Guide...

Страница 2: ...eople that make things happen At Ross our employees are a special group Our employees truly care about doing a great job and delivering a high quality customer experience every day This code of ethics...

Страница 3: ...Refer to the Important Regulatory and Safety Notices document that accompanied your product EMC Notices United States of America FCC Part 15 This equipment has been tested and found to comply with th...

Страница 4: ...al resources Ross Video encourages you to use the appropriate take back systems These systems will reuse or recycle most of the materials from your end of life equipment in an environmentally friendly...

Страница 5: ...13 Operating Environment Requirements 13 Rack Mount Installation 14 Installing the ACO 2200 into a Rack Unit 14 Installing the Rear Support Brackets 14 Connecting Power 15 Setting the Initial IP Addre...

Страница 6: ...30 Network Tabs 31 Calibration 01 06 Tab 32 Technical Specifications 33 General Characteristics 33 Performance Conditions 33 BNC Channels 33 Ethernet Interface 34 DC Power Source 34 Physical Specifica...

Страница 7: ...ides a list of terms used throughout this guide Related Publications It is recommended to consult the following Ross documentation before installing and configuring your ACO 2200 ACO 2200 Quick Start...

Страница 8: ...close as the nearest telephone Our 24 hour Hot Line service ensures you have access to technical expertise around the clock After sales service and technical support is provided directly by Ross Video...

Страница 9: ...type of input There is a selection of predefined checking levels relating to the various signals that are supported No Measurement Color Black no ancillary signals present i e only Sync and Burst Colo...

Страница 10: ...the ACO 2200 Figure 2 1 ACO 2200 Functional Diagram BACKUP PEAK DETECT PRIMARY PEAK DETECT PRIMARY LEVEL CHECK BACKUP LEVEL CHECK Output Primary Input Secondary Input RELAY OTHER CHANNELS OTHER CHANN...

Страница 11: ...y Backup Mode Button and LEDs This button enables the user to select either the Primary or Backup inputs 5 Panel Lock Unlock Button and LEDs This button allows the user to select if the front panel bu...

Страница 12: ...take into account and be aware of the limitations of the switching relay regarding voltage current and signal bandwidth 2 Ethernet 100 Base T Connection This rear panel connector is a standard RJ45 E...

Страница 13: ...rior to shipment the ACO 2200 is thoroughly inspected for mechanical defects 4 Verify that the shipping carton contains the instrument the standard accessories and any optional accessories that you or...

Страница 14: ...n be attached to the ACO 2200 in six possible positions Figure 4 1 Figure 4 1 Installing the Support Brackets To install the support brackets 1 Choose the position that suits the cabinet depth and wil...

Страница 15: ...ddress The ACO 2200 is remotely controlled over an Ethernet link by a DashBoard client When using DashBoard to communicate with the ACO 2200 the ACO 2200 is always configured as a fixed IPv4 device us...

Страница 16: ...with suitable connectors are supplied with the ACO 2200 Power Cords All ACO 2200 are shipped with one of the following power cord options Power cords for use in the United Kingdom are BS1363 approved...

Страница 17: ...e included which suggest cycling through menu options in order to check operation this is not mandatory a simple check for presence or absence of a signal will suffice Full details regarding the optio...

Страница 18: ...User settings are made using DashBoard Recommendation The ACO 2200 menu system contains an appreciable number of pre programmed and user selectable settings All of these settings are programmed using...

Страница 19: ...olbar select File New TCP IP DashBoard Connect or openGear Device The New TCP openGear Frame Connection dialog opens 2 Type the IP address of the ACO 2200 in the IPAddress field 3 Type a unique name f...

Страница 20: ...To ensure that you have a suitable channel configuration for the purposes of this Functional Check you should perform the following procedures The procedures in this section assume that you have laun...

Страница 21: ...node The Channel Setup interface displays in the DashBoard window 2 Select the Channels 1 6 tab 3 Select the channel to update For initial configuration select Channel 1 4 Select the channel type fro...

Страница 22: ...put signal Analog Color Black and a fault indication appears on the display 2 Re connect the Primary input signal Composite Video Note that the fault indication changes to show that the Primary input...

Страница 23: ...luence the initial installation of your ACO 2200 The following guidelines outline a typical example Power The ACO 2200 will automatically switch to the Primary inputs whenever it loses power So you sh...

Страница 24: ...will be helpful to refer to in the future in order to quickly find out whether for example a previously unused channel requires a menu change relating to the new signal to be monitored Table 5 1 ACO...

Страница 25: ...ult is only an intermittent one the fault indicator will stay illuminated If more than one fault exists only the first one is reported i e counting from the lowest numbered configured channel As fault...

Страница 26: ...ons have been made then try repeating the above procedure after powering down the ACO 2200 and then resuming from the update program start up line 5 If the ACO 2200 still cannot be found contact Ross...

Страница 27: ...ents Tab The Events tab provides access to the last 99 events recorded by the ACO 2200 These events may relate to normal expected functionality or to systemic errors This information might be useful i...

Страница 28: ...r of times each power supply has been cycled and the running hours count EventGPSTimeLost 7 EventNewMinTemp0 34 EventSetUTCTimeFromNTP 8 EventNewMinTemp1 35 EventNTPTimeLost 9 EventNewMinTemp2 36 Even...

Страница 29: ...only fields Recover Mode indicates how the ACO 2200 is configured for recovery from faults Recovery Delay in Seconds indicates how many seconds the optional recovery delay is set for Recovery Delay in...

Страница 30: ...ver after the primary fault is fixed immediately This mode returns to the primary as soon as the ACO 2200 sees the primary signals have returned Automatic recover after Primary fault is fixed after de...

Страница 31: ...This menu allows the user to enter the pre determined IP address of the ACO 2200 IP Sub Net Mask This menu allows the user to enter the pre determined SubNet Mask address of the ACO 2200 Gateway Addr...

Страница 32: ...DashBoard Menus ACO 2200 User Guide v5 0 Calibration 01 06 Tab The Calibration 01 06 tab enables the user to see the factory calibration data for the ACO 2200 Figure 7 4 Example of Calibration 01 06 T...

Страница 33: ...ditions are within the operating limits described in the section Environment Characteristics on page 34 The ACO 2200 must have a warm up period of at least 20 minutes The ACO 2200 must have been calib...

Страница 34: ...cifications DC Power Source Category Performance Requirement Notes Operational Voltage Range 10 13 VDC Absolute Limits Voltage Range 9 14VDC Operational AC Current 0 74A Power Consumption 9VA Table 8...

Страница 35: ...to 60 C non condensing Altitude Operating To 2 000m 6 561ft Non operating To 12 192m 40 000ft Vibration Operating 2 65m s2 0 27Grms 5Hz to 500Hz 10 minutes per axis three axes Non operating 22 3m s2 2...

Страница 36: ...36 Technical Specifications ACO 2200 User Guide v5 0...

Страница 37: ...ult in an electrically conductive path A vacuum cleaner may be used to remove accumulated dust on the outside of the instrument Ensure that the nozzle is fitted with a soft brush head or similar to av...

Страница 38: ...orm internal service or adjustments of this product unless another person capable of rendering first aid and resuscitation is present Disconnect Power To avoid electric shock switch off the power to t...

Страница 39: ...ils name company telephone email the frame serial number of the unit original delivery date Warranty and Repair Policy The ACO 2200 is warranted to be free of any defect with respect to performance qu...

Страница 40: ...the responsibility of you the customer All products shipped to you from Ross Video Limited will be shipped collect The Ross Video Technical Support Department will continue to provide advice on any p...

Страница 41: ...eplerian like parameters with corrections that account for the perturbations to the orbit caused by the earth s gravitational field and other forces Epoch is an instant of time or a date from which va...

Страница 42: ...42 Glossary ACO 2200 User Guide v5 0...

Отзывы: