![Rosemount 1199 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/rosemount/1199/1199_reference-manual_1487371034.webp)
Reference Manual
00809-0100-4002, Rev BB
November 2012
Rosemount 1199
3-14
Tank Preparation
When preparing the tank, ensure an area with a minimum diameter of 9 ¼-in.
(235 mm) is available to properly weld the tank spud, Figure 3-22 bullet 1. The
center of the tank spud should be at least 1 ½-in. (38 mm) below the minimum
measurement level, as shown in bullet 2 of Figure 3-22. In order to get a
proper process fluid measurement, half of the remote seal diaphragm must be
covered.
Figure 3-22. Tank Preparation
Bullet 3 shows the actual hole cut in the tank. Attempt to cut the hole as
smoothly and as circular as possible. A torch cut is not recommended. The
tank spud OD is 5.98-in. ±.010-in. (152 mm ± 0.25 mm). When cutting the
hole for the tank spud, the gap between the hole diameter and spud OD
should be held to a minimum. It is recommended that the hole be no larger
than 6.020-in. (153 mm). Anything larger than 6.020-in. (153 mm) could
increase the amount of tank spud distortion.
If a bevel(s) is required, an angle no larger than 37.5º is recommended; see
ASME B16.25 for more details. Bevels can be made on one or both sides of
the tank. Do not grind or cut the bevel to a sharp point. Attempt to leave a flat
area, as shown in Figure 3-23 below.
Figure 3-23. Bevel Example
Содержание 1199
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 8: ...Reference Manual 00809 0100 4002 Rev BB November 2012 Rosemount 1199 TOC 4 ...
Страница 20: ...Reference Manual 00809 0100 4002 Rev BB November 2012 Rosemount 1199 2 10 ...
Страница 38: ...Reference Manual 00809 0100 4002 Rev BB November 2012 Rosemount 1199 3 18 ...
Страница 60: ...Reference Manual 00809 0100 4002 Rev BB November 2012 Rosemount 1199 5 10 ...
Страница 81: ...This page intentionally left blank ...