Operation
Lifter
257 / 564
The correct setting of the rollers movement height fulfills two purposes:
Ensuring optimum beet flow. We recommend to have shaft movement always as
high as possible above ground. The maximum height has just been exceeded,
when, during lifting, the beet flow falters from the lifting shares to the first lifting
roller.
Guiding of the lifting rollers at the correct height. In case of soil of different hard-
ness, the height adjustment of the depth-control shaft is able to balance out sinking
in of the depth-control shaft into the soil to different depths. The lifting rollers should
be guided above the soil at always the same height, which is no longer ensured for
differing sinking in of the depth-control shaft.
Rollers movement height is displayed on the R-Touch.
5
Height adjustment of shaft movement is performed by diagonal pushing or pulling of
the X-Y key (
5
) on the joystick.
If the X-Y key is touched briefly, the adjustment will be performed gradually by one
step up or down.
To directly adjust for several stages at once, the X-Y key may be moved to the
required position and held for so long until the desired setting has been reached.
The X-Y key (
5
) is programmed for the following dual function: when pressing the X-Y
key (
5
) if the multi-key (
11
) is pressed, the rollers movement height is adjusted simulta-
neously on both sides, regardless of to which side the X-Y key is moved.
11
Содержание Tiger 6
Страница 3: ...Contents 3 564 Contents...
Страница 4: ...Contents 4 564...
Страница 13: ...Preface 13 564 1 Preface...
Страница 14: ...Preface 14 564...
Страница 22: ...Safety 22 564...
Страница 23: ...Safety 23 564 2 Safety...
Страница 24: ...Safety 24 564...
Страница 41: ...General View and Specifications 41 564 3 General View and Specifications...
Страница 42: ...General View and Specifications 42 564...
Страница 53: ...General Description 53 564 4 General Description...
Страница 54: ...General Description 54 564...
Страница 57: ...Operating Components 57 564 5 Operating Components...
Страница 58: ...Operating Components 58 564...
Страница 63: ...Operating Components Driver s cabin overview 63 564 13 14 15 13 First aid box 14 Blow gun 15 USB interface...
Страница 98: ...Operation 98 564...
Страница 99: ...Operation 99 564 6 Operation...
Страница 100: ...Operation 100 564...
Страница 226: ...Operation Defoliator 226 564 RIS defoliator RES defoliator...
Страница 256: ...Operation Lifter 256 564 6 14 4 Setting rollers movement height High rollers movement High rollers movement...
Страница 291: ...Operation Infeed conveyor 291 564 2 1 1 Infeed conveyor control block...
Страница 299: ...Operation Strainer wheels turbines 299 564 4 Rpm strainer wheels...
Страница 325: ...Operation Bunker unloading 325 564 6 19 Bunker unloading...
Страница 327: ...Operation Bunker unloading 327 564 45 51 50 47 46 52 53 54 48 55 49 56 Key overview See Page 88...
Страница 361: ...Maintenance and Service 361 564 7 Maintenance and Service...
Страница 362: ...Maintenance and Service 362 564...
Страница 418: ...Maintenance and Service Defoliator 418 564 Defoliator in the maintenance position...
Страница 475: ...Malfunction and Remedies 475 564 8 Malfunction and Remedies...
Страница 476: ...Malfunction and Remedies 476 564...
Страница 527: ...Lists Tables Plans Diagrams Maintenance Verification 527 564 9 Lists Tables Plans Diagrams Maintenance Verification...
Страница 528: ...Lists Tables Plans Diagrams Maintenance Verification 528 564...
Страница 558: ...558 564...
Страница 559: ...Index 559 564 10 Index...
Страница 560: ...Index 560 564...