77-014 - Yasui Rotating Burnout Furnace 37+
11
3. INSTALLING
3-1. UNPACKING
1) Remove the hex-socket head lock bolt of the
handle with a hex wrench. Keep this bolt to transport the
machine when necessary in the future.
2) Open the door, and remove cushioning material
between the turntable and the heater. (Do not give
unnecessary strong force at this time, otherwise
the heater surface may be damaged.)
3-2. MAIN UNIT
IMPORTANT
Great attention should be given to ambient temperature at installation of the machine. In case
two or more machines are arranged side by side, allow enough spacing.
Do not use the machine in a closed room.
Provide adequate ventilation of air for the machine.
1) When doorways are not wide enough, the power control box can be separated from the
furnace body temporarily. Contact the distributor at your place.
2) Mount the machine on a sturdy place
endurable to weight. (Weight of the machine
may be more than 600 Kg when flasks are
contained.)
3) After placement of machine, turn the level
adjusters so that the machine will be stably
supported by the level adjusters.
4) Sufficient clear space should be left
around the machine so that daily operation
and maintenance will not be obstructed.
Especially, if another furnace is placed next,
there should be at least 300 mm clearance
between the machines.