background image

EN

17 ELECTRICAL CONNECTIONS

All electrical connections must be made with the unit disconnected from mains 
power and, if applicable, battery power.
See the 

CTRL

 controller manual for instructions on making connections and 

programming.
Before connecting to electrical power, ensure that the mains power specifications 
on the identification plate match the mains power supply used.
A switch or an omnipolar cut-off switch with a contact opening of at least 3 mm 
must be installed on the mains power line.
Ensure that an adequate residual current circuit breaker and a suitable overcurrent 
cut-out are installed ahead of the electrical installation.
Use a 3x2.5 mm

2

 double insulated cable for the mains power line.

Feed the cable on the left hand side of the barrier through the openings on the left 
hand side of the controller casing and connect it to the terminals L (brown), N (blue) 
and 

  (yellow/green) inside the automation unit.

Fasten the power cable with the cable grips included.
At least 50 mm of the connector cable conduit must protrude from the holes in the 
base plate and into the automation unit.
Ensure that there are no sharp edges which could damage the power cable.

24

25

A

B
C

D

E

OFF

F

G

G

Z x4

BLACK

RED

BATTERY (+)

BATTERY C

SEC2

BATTERY (-)

1

2

3

4

5

ROSSO
RED 

BLU/BLUE

NERO/BLACK (-)

(+)

18  INSTALLING THE BATTERY KIT (OPTIONAL)

1.  Disconnect the mains power.
2.  Unscrew the four screws [Z] and remove the head [A] (if applicable).
3.  Lift the cable grommet [B] and disconnect the connector [C].
4.  Open the transparent control unit cover [D].
5.  Switch the control unit switch to the OFF position [E].
6.  Lift the control unit and insert the batteries in their housing [F].
7.  Connect the red, black and blue wires to the batteries (see detailed view)
8.  Connect the batteries to the 

+BATTERY

 terminal (red wire) and 

-BATTERY

 terminal (black wire).

9.  Insert the battery charge board 

BI/BCHP

 in the plug-in connector [G].

10.  Reposition the control unit.
11.  Switch the control unit switch to the ON position [E].
12.  Reposition the transparent control unit cover [D]. 
13.  Reconnect the connector [C] and close the cable grommet [B].
14.  Close the head [A] and tighten the four front screws [Z].
15.  Reconnect the mains power. 

L

N

Содержание BI/008

Страница 1: ...autom tica Brushless Barreira autom tica Brushless IT Manuale di installazione EN Instruction and warnings for the installer DE Anleitungen und Hinweise f r den Installateur FR Instructions et averti...

Страница 2: ...operation are tted Display the signs required by law to identify hazardous areas Each installation must bear a visible indication of the data identifying the motorised door or gate An omnipolar discon...

Страница 3: ...up to 8 metres with on board control unit digital absolute encoder complete with xing base with tie rods and screws and boom xing ange For line voltages of 115V 6 STANDARD DIMENSIONS 492 900 1237 427...

Страница 4: ...STOP 2500 2500 GRADE OF PROTECTION IP54 IP54 OPERATING TEMPERATURE 20 C 55 C 20 C 55 C CONTROL UNIT INTEGRATED 36 Vdc CTRL CTRL ACCESSORIES POWER SUPPLY 24 Vdc 24 Vdc BOOM up to 8 m up to 8 m EMERGEN...

Страница 5: ...dation plate for securing the barrier 15 BAFS 01 Fixed support with rubber NOT adjustable 10 REFERENCES AND ACCESSORIES Code Description 16 BAFS 03 Fixed support with rubber NOT adjustable with provis...

Страница 6: ...n the overall dimensions of the installation The installer is responsible for determining the most suitable solution Excavate a foundation pit measuring 1 5 m x 1 m x 0 5 m and ll with concrete reinfo...

Страница 7: ...from the anchors on the base plate g 3 Open the inspection hatch turning the key clockwise by 90 g 4 Remove the inspection hatch g 5 Place the cabinet on the plate The anchors on the base plate must t...

Страница 8: ...tions could be hazardous for the installer For LEFT hand installations 1 Unlock the barrier see chapter 23 2 Turn the linkage lever as shown in g 8 3 Move the mechanical stop see chapter 14 4 Lock the...

Страница 9: ...aration g 9 Remove the plug Q1 and the end ange R1 These two parts will NOT be used again Remove the led cover N1 and shorten it by 285 mm from the side where it is fastened to the boom support Remove...

Страница 10: ...to the connector M2 with the 10 self drilling screws L included 5 above and 5 under along the boom axis at a distance of 60 mm apart g 13 8 Insert the nishing collar I on the boom 9 Insert the boom i...

Страница 11: ...rstood as complete with shock resistant rubber and LED strips The adjustable xed end rest with integrated magnet BAFS 05 must be used The adjustable xed end rest with integrated magnet BAFS 05 must be...

Страница 12: ...ost appropriate slider CU for a correct balancing of the boom 13 2 Slider selection The correct position of the slider is determined by the boom weight the heavier the boom is weight determined by the...

Страница 13: ...ries installed the more to the outside the springs should be installed hole A 4 Check the correct operation of the balancing system Lift the boom manually to an angle of 45 and let go If the boom rise...

Страница 14: ...ss bar B the spring tensioning increases vice versa by moving it downward the tensioning decreases 3 Lift the boom manually to an angle of 45 and let go If the boom rises reduce the spring tension If...

Страница 15: ...cheon plate B of the lock release system prising the lateral clips open to detach Undo the two self tapping screws C and remove the aluminium front panel D Undo the four M5 nuts E Push the steel conne...

Страница 16: ...e photocell housing from the inside Fasten the G90 F4ES photocells to the barrier Route the connector cables upwards taking care not to interfere with the movements of the automation system and push t...

Страница 17: ...t 50 mm of the connector cable conduit must protrude from the holes in the base plate and into the automation unit Ensure that there are no sharp edges which could damage the power cable 24 25 A B C D...

Страница 18: ...ower supplies if applicable 2 Unscrew the four screws Z that fasten the head A to the barrier 3 Lift the cable grommet C 4 Disconnect the connector B 5 Remove and overturn the head A 6 Remove the BI B...

Страница 19: ...connections Check that the manual lock release system works Check that the boom is balanced correctly as indicated in chapter 13 Check that there are now plants within the radius of action of the boo...

Страница 20: ......

Страница 21: ......

Отзывы: