13.3 

Spring unit installation

1.  Unlock the barrier (see chapter 23) and move the boom into the completely open vertical position.
2.  Fasten the spring unit 

SP/85/AS/02

 to the linkage lever using the screws included (fig. 17), according to the opening direction and in the position that allows the 

correct movement of the barrier. The internal roller bearing [

S

] is composed of 3 modular elements which, if incorrectly assembled, inhibit the correct operation of the 

barrier.

CAUTION

: using the slider hole that is the farthest from the linkage lever centre, during barrier operation, the springs will be more tensioned, while, vice versa, when using 

the slider hole that is the closest to the linkage lever centre, the springs will be less tensioned.
3.  Fasten the springs to the fixed structure (fig. 18) on the steel cross bar of the barrier, using the screws included. The heavier the boom is (totality of the accessories 

installed), the more to the outside the springs should be installed (hole 

A

).

4.  Check the correct operation of the balancing system.

•  Lift the boom manually to an angle of 45° and let go. If the boom rises or falls, try another position of the slider 

CU1

. Whenever this is not sufficient, the slider can be 

rotated by 180°, to change the 2 mm holes pitch (fig. 15 - values 136 and 138). 

•  To obtain millimetre precision, replace CU1 with the 

CU2

 slider included (fig. 16 - values 135 and 137). 

5.  Grease the points indicated in fig. 17 and 18 with LITHIUM grease (EP LITHIUM). Available upon request, article 

RS/GR1/100

: 100 g can of lithium grease.

Lithium

Li

A

B

C

OBBLIGATORIO LUBRIFICARE!

OBLIGATORY TO LUBRICATE!

17

18

Lithium

Li

OBBLIGATORIO LUBRIFICARE!

OBLIGATORY TO LUBRICATE!

LATO INTERNO (BARRIERA)

INTERNAL SIDE (BARRIER)

LATO ESTERNO

EXTERNAL SIDE

LATO ESTERNO

EXTERNAL SIDE

8

7

6

5

4

3

2

1

S

S

Lato Esterno

External side

S

1. VITE - 

SCREW

2. RONDELLA - 

WASHER 

 Ø 15

3. RONDELLA - 

WASHER 

 Ø 12,5

4. BOCCOLA - 

SOCKET

5. RONDELLA - 

WASHER 

Ø 15

6. RONDELLA - 

WASHER 

Ø 24

7. RONDELLA - 

WASHER

 Ø 24

8. DADO - NUT

4

3

2

LATO INTERNO (BARRIERA)

INTERNAL SIDE (BARRIER)

Содержание BI/008

Страница 1: ...autom tica Brushless Barreira autom tica Brushless IT Manuale di installazione EN Instruction and warnings for the installer DE Anleitungen und Hinweise f r den Installateur FR Instructions et averti...

Страница 2: ...operation are tted Display the signs required by law to identify hazardous areas Each installation must bear a visible indication of the data identifying the motorised door or gate An omnipolar discon...

Страница 3: ...up to 8 metres with on board control unit digital absolute encoder complete with xing base with tie rods and screws and boom xing ange For line voltages of 115V 6 STANDARD DIMENSIONS 492 900 1237 427...

Страница 4: ...STOP 2500 2500 GRADE OF PROTECTION IP54 IP54 OPERATING TEMPERATURE 20 C 55 C 20 C 55 C CONTROL UNIT INTEGRATED 36 Vdc CTRL CTRL ACCESSORIES POWER SUPPLY 24 Vdc 24 Vdc BOOM up to 8 m up to 8 m EMERGEN...

Страница 5: ...dation plate for securing the barrier 15 BAFS 01 Fixed support with rubber NOT adjustable 10 REFERENCES AND ACCESSORIES Code Description 16 BAFS 03 Fixed support with rubber NOT adjustable with provis...

Страница 6: ...n the overall dimensions of the installation The installer is responsible for determining the most suitable solution Excavate a foundation pit measuring 1 5 m x 1 m x 0 5 m and ll with concrete reinfo...

Страница 7: ...from the anchors on the base plate g 3 Open the inspection hatch turning the key clockwise by 90 g 4 Remove the inspection hatch g 5 Place the cabinet on the plate The anchors on the base plate must t...

Страница 8: ...tions could be hazardous for the installer For LEFT hand installations 1 Unlock the barrier see chapter 23 2 Turn the linkage lever as shown in g 8 3 Move the mechanical stop see chapter 14 4 Lock the...

Страница 9: ...aration g 9 Remove the plug Q1 and the end ange R1 These two parts will NOT be used again Remove the led cover N1 and shorten it by 285 mm from the side where it is fastened to the boom support Remove...

Страница 10: ...to the connector M2 with the 10 self drilling screws L included 5 above and 5 under along the boom axis at a distance of 60 mm apart g 13 8 Insert the nishing collar I on the boom 9 Insert the boom i...

Страница 11: ...rstood as complete with shock resistant rubber and LED strips The adjustable xed end rest with integrated magnet BAFS 05 must be used The adjustable xed end rest with integrated magnet BAFS 05 must be...

Страница 12: ...ost appropriate slider CU for a correct balancing of the boom 13 2 Slider selection The correct position of the slider is determined by the boom weight the heavier the boom is weight determined by the...

Страница 13: ...ries installed the more to the outside the springs should be installed hole A 4 Check the correct operation of the balancing system Lift the boom manually to an angle of 45 and let go If the boom rise...

Страница 14: ...ss bar B the spring tensioning increases vice versa by moving it downward the tensioning decreases 3 Lift the boom manually to an angle of 45 and let go If the boom rises reduce the spring tension If...

Страница 15: ...cheon plate B of the lock release system prising the lateral clips open to detach Undo the two self tapping screws C and remove the aluminium front panel D Undo the four M5 nuts E Push the steel conne...

Страница 16: ...e photocell housing from the inside Fasten the G90 F4ES photocells to the barrier Route the connector cables upwards taking care not to interfere with the movements of the automation system and push t...

Страница 17: ...t 50 mm of the connector cable conduit must protrude from the holes in the base plate and into the automation unit Ensure that there are no sharp edges which could damage the power cable 24 25 A B C D...

Страница 18: ...ower supplies if applicable 2 Unscrew the four screws Z that fasten the head A to the barrier 3 Lift the cable grommet C 4 Disconnect the connector B 5 Remove and overturn the head A 6 Remove the BI B...