Rockwell Automation Publication 20P-TG003B-EN-P - September 2021
33
Component Test Procedures
Chapter 2
5.
With the digital multimeter set to “diode test”, measure each connection
point on the pulse transformer board listed in the tables below. If any of
the actual measurements are out of tolerance, replace the pulse transformer
board.
Table 8 - Armature Pulse Transformer Primary Measurements for Regenerative and Non-
Regenerative Drives
Table 9 - Armature Pulse Transformer Primary Measurements for Regenerative Drives
Check the Field SCR/Dual Diode Module
The field supply consists of a dual pack SCR/dual diode module arranged in a
single–phase full wave rectifier configuration. Malfunction of either of these
components may cause various responses including field and velocity related
faults, or blown fuses. The following procedures can be used if field bridge
malfunctions are suspected.
1.
General Safety Precautions on page 10
.
2.
Remove and lock-out all incoming power to the drive. See
3.
Remove the protective covers. See
4.
Verify that contactor power (if used) is removed.
5.
Verify that power to an external field supply (if used) is removed.
6.
Disconnect the field wires from C1 and D1. See
For SCR
(+) Meter Lead
(-) Meter Lead
Meter reading:
Connector XY Pinout
1/01
XY-8
XY-1
0.41
4/04
XY-8
XY-4
2/02
XY-8
XY-2
5/05
XY-8
XY-5
3/03
XY-8
XY-3
6/06
XY-8
XY-6
For SCR
(+) Meter Lead
(-) Meter Lead
Meter reading:
Connector XY Pinout
1
XY-7
XY-1
0.41
4
XY-7
XY-4
2
XY-7
XY-2
5
XY-7
XY-5
3
XY-7
XY-3
6
XY-7
XY-6
10
.
.
.
.
.
1
10
.
.
.
.
.
1
Содержание Allen-Bradley PowerFlex 4M
Страница 1: ...PowerFlex Digital DC Drive Frame C Bulletin Number 20P Hardware Service Manual Original Instructions ...
Страница 8: ...8 Rockwell Automation Publication 20P TG003B EN P September 2021 Preface Notes ...
Страница 146: ...146 Rockwell Automation Publication 20P TG003B EN P September 2021 Index Notes ...