ROBOVENT • SPIRE SERIES OWNER’S MANUAL
29
Commissioning Your Unit
The following items checked during the start-up/commissioning process, as applicable to
your specific layout:
1. Check the electrical connection to the collector and ensure there are no loose wires.
2. Check the compressed air that was hooked-up to the RoboVent supplied regulator
and confirm it is clean, dry, and set to 85 psi.
3. Check the blower rotation on each motor to confirm it is spinning correctly.
4. Perform basic system check to ensure it is functional:
a. Check to ensure blower turns on when touched on HMI
b. Perform a valve check (See maintenance guideline for more information on how
to perform this check) to ensure that each pulse valve is operational.
5. Check to ensure the fire suppression (FM200) tubing is hooked up correctly, if
applicable.
6. Check the FM200 gauge to ensure your suppression tank is charged, if applicable.
7. Check that the filter differential tubes (running from the control panel to the reading
ports) are correctly connected; ensure the filter pressure is reading correctly on the
HMI control screen.
8. Check to ensure every bolt was installed during the collector assembly.
9. Check and confirm operation of other custom equipment options (ex: Intake
Dampers, etc.).
10. Check the ductwork and ensure it is connected and sealed correctly.
11. Check the filter and control door gaskets to ensure consistent seal during operation.
12. Check and ensure collector seams were properly sealed during the assembly process.
13. Verify and record the velocity (FPM) through the Delta3 spark arrestor, if applicable.
a. Specific velocity range is required through the Delta3 to prevent sparks from
getting through.
14. Verify and record the velocity (FPM) and airflow (CFM) for the entire system
SECTION 600
Start-up/Commissioning and Balancing
Содержание Spire MLS-01-5500-10
Страница 2: ......
Страница 6: ......
Страница 7: ...ROBOVENT SPIRE SERIES OWNER S MANUAL 7 SECTION 100 Important Safety Instructions ...
Страница 9: ...SECTION 200 Glossary of Terms ...
Страница 13: ...SECTION 300 Features of the Spire Series Collector ...
Страница 18: ...18 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Страница 19: ...SECTION 400 Receiving Inspection ...
Страница 21: ...SECTION 500 Installation ...
Страница 26: ...26 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Страница 27: ...SECTION 600 Start up Commissioning ...
Страница 31: ...SECTION 700 System Balancing ...
Страница 33: ...ROBOVENT SPIRE SERIES OWNER S MANUAL 33 SECTION 800 Operating your Spire Collector using the Control Screen ...
Страница 39: ...SECTION 900 Maintenance ...
Страница 52: ...52 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Страница 53: ...ROBOVENT SPIRE SERIES OWNER S MANUAL 53 SECTION 1000 Troubleshooting ...
Страница 58: ...58 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Страница 59: ...APPENDIX A General Wiring Diagrams ...
Страница 65: ...APPENDIX B Parts List ...
Страница 66: ...B 2 ROBOVENT SPIRE SERIES OWNER S MANUAL APPENDIX B Parts List C D E F G M L K J I H A B ...