Notes on connections
Connection and programming examples
29
SYCON
3000 H
Solenoid valve at the output OUT 2
Function:
Function:
Function:
Function:
the solenoid valve closes if an excessive water hardness is measured 3 times consecutively or if a mal-
function exists. In this way, the water supply to the consumers can be interrupted. Thereafter, no fur-
ther analyses are conducted. A deletion must take place by hand – or be subsequently programmed
as in this example – by an external switch (switch station/control room) and the valve re-opened in this
manner.
Programming:
Programming:
Programming:
Programming:
5.2 = PS2
=
Solenoid valve closes permanently after an activation
5.4 = PS2 | =
Activation of the solenoid valve through operation of the relay
6.5 = No
=
No further analyses on activation of the solenoid valve
6.6 = 3 *
=
Activation of the solenoid valve on the third successive overrun of the limit
6.7 = RF -
=
No activation on occurrence of the message "Refill indicator"
NF |
=
Activation on occurrence of the message "Indicator deficient Analysis stop"
ZL |
=
Activation on occurrence of the message "Blank value too low"
VH |
= Activation on occurrence of the message "Internal measurement too high"
VL |
= Activation on occurrence of the message "Internal measurement too low"
The programming of 1.5 in the case of OUT 1 applies to all outputs
Floating fault signal contact at OUT 3
Function
Function
Function
Function::::
In the event of an instrument malfunction, including the instrument being switched off, a fault message
is sent to a control room. A fault message does not occur if the water hardness is exceeded.
Programming
Programming
Programming
Programming::::
5.3 =
MEL = Signal relay
5.4 =
MEL ---- = Activation of the fault message when the relay is released (inoperative)
6.9 =
RF ---- = No activation on occurrence of the message " Refill indicator"
NF | = Activation on occurrence of the message " Indicator deficient Analysis stop"
ZL | = Activation on occurrence of the message "Blank value too low"
VH | = Activation on occurrence of the message "Internal measurement too high"
VL | = Activation on occurrence of the message "Internal measurement too low"
Flow monitor at IN 1
Function:
Function:
Function:
Function:
If water is extracted from the treatment plant, the contact of the flow monitor closes. Several successive
make times are added. As soon as the sum of the make times is greater than 60 seconds, a new
analysis is started.
Programming:
Programming:
Programming:
Programming:
3.1 =
Stop
= Function "Stop analysis"
3.3 =
START | = Analysis start when contact closed
4.1 =
60s
= Delay time for an analysis start = 60 seconds