RLS Wacon SYCON 3000 H Скачать руководство пользователя страница 11

 

Output functions 

 

 

 

SYCON 
3000 H

 

Output functions 

Of the 5 available output functions, maximally 3 can be programmed for the outputs of the analyser. 
The  output  function  "Permanent  signal"  is  available  in  2  different  versions.  With  the  output  function 
"Permanent signal 2" the relay can also be activated in the case of a disturbance in function. 
The activation of the outputs Pulse signal and Permanent signal can occur with hard water or soft wa-
ter according to the programming in programme step 1.5. 
In programme step 5.4, it is determined whether the outputs are active when the electrical voltage is 
switched off or when live.   

 

Pulse signal 

The  signal  serves  to  trigger  signal  devices, 
programme mechanisms or PLC controls. 

 

The  pulse  duration  can  be  selected  in  pro-
gramme  step  6.1  between  1  and  999  sec-
onds. 

 

Im  programme  step  6.2,  the  number  of  bad 
messages  is  programmed  after  which  the  sig-
nal is activated.  

 

Permanent signal 1 

The  signal  serves  to  trigger  valves,  horns  or 
signal  devices  that  require  a  permanent  con-
tact after the limit value over/underrun.  
 
In  programme  step  6.3,  it  is  programmed 
whether  the  relay  is  deactivated  again,  if  on 
the  next  analysis  the  result  "Water  good"  oc-
curs, or if no further analyses are to be made. 
In  this  case,  a  deletion  must  take  place  by 
hand or via the input "Reset relay". 
 
In  programme  step  6.4,  the  number  of  bad 
messages  is  programmed  after  which  the  sig-
nal is activated. 

 

Permanent signal 2 

The  signal  serves  to  trigger  valves,  horns  or 
signal  devices  that  require  a  permanent  con-
tact during the limit value over/underrun.  
 
The  function  corresponds  to  the  output  func-
tion "Permanent signal 1". However, the output 
relay can also be activated in the event of dis-
turbances  in  instrument  functioning  (pro-
gramming 6.7). 

A  connected  shut-off  valve  is  then  closed  not 
only with an over/underrun of the water hard-
ness, but also in the event of a functional dis-
turbance.  
 
In  programme  step  6.5,  it  is  programmed 
whether  the  relay  is  deactivated  again,  if  on 
the  next  analysis  the  result  "Water  good"  oc-
curs, or if no further analyses are to be made. 
In  this  case,  a  deletion  must  take  place  by 
hand or via the input "Reset relay". 
 
In  programme  step  6.6,  the  number  of  bad 
messages  is  programmed  after  which  the  sig-
nal is activated. 

 

Analysis active 

This  output  function  is  activated  during  an 
analysis, during the extra flushing and on cali-
bration.  

 

Valves  or  pumps  can  be  triggered  to  supply 
the analyser with water.  

 

A  valve  for  the  cool-water  inflow  of  a  cooler 
can also be controlled. In order to cool down 
the test water initially, the opening of the input 
valve in the analyser can be delayed within the 
range  of  0-999  seconds  (programme  step 
6.8). 

 

Indicator  or  signal  devices  can  also  be  con-
nected to display the analysis process. 

 

Signal relay 

In  programme  step  6.9,  it  is  determined  with 
which fault messages this relay is activated.  

 

Содержание SYCON 3000 H

Страница 1: ...OPERATING MANUAL Analytical Instrument to Measure the Total Hardness of Water SYCON 3000 H...

Страница 2: ...urement too low 6 Water hardness over underrun 6 Permanent signal 1 6 Permanent signal 2 6 Input functions 7 Start analysis 7 Stop analysis 7 Reset relay 7 Water meter 7 Output functions 8 Pulse signa...

Страница 3: ...function 2 17 Number of the bad messages 17 Activation through a fault 17 Output function Analysis is running 17 Analysis delay 17 Output function Signal relay 18 Fault messages 18 7 Activation of th...

Страница 4: ...alve is opened Each measurement begins with an adjustable flushing phase This ensures that the water from the treatment plant is measured and not the water that has remained in the supply line since t...

Страница 5: ...isplaying the last result i e Soft water or Hard water blink If both the control lamps Soft water and Hard water are blinking no analysis result is available e g after the instrument has been switched...

Страница 6: ...s arranged beneath it e g START and FLUSH Displays during the analyses B l a n c v a l u e 2 s 1 L i m i t 2 3 p p m 9 0 E N D During an analysis the phases Flush Black value Blanc value Titration and...

Страница 7: ...F O The functions of the inputs IN1 and IN2 with their current switching states are displayed A horizontal line alongside the designation means Input not active A vertical line alongside the designati...

Страница 8: ...Press the SERV key After 4 seconds the ser vicing phase is initiated You can recalibrate the electronics and switch the metering pump on and off See also the section Service setting 1 and 2 on page 2...

Страница 9: ...r sample contaminated No flush occurred No water inflow Calibration necessary Electrical defect check connector Internal measurement too high A T T E N T I O N I n t r m e a s u r t o o h i g h A n a...

Страница 10: ...analysis starts if the contact of the flow moni tor is activated longer then 10 seconds An analysis also starts if the contact is activated 5 times for 2 seconds e g if water is only taken out for a s...

Страница 11: ...6 4 the number of bad messages is programmed after which the sig nal is activated Permanent signal 2 The signal serves to trigger valves horns or signal devices that require a permanent con tact duri...

Страница 12: ...low measured value too high measured value too low These faults effect an analysis stop which must be deleted by hand Recorder output RC 2 A recorder at this output permanently registers the displaye...

Страница 13: ...seconds until this display appears C H A N G E p r o g r a m m l a n g u a g e P R O G R M L A N G U A E N D 3 Should you wish to change the language of the LCD display press the LANGUA key E N G L I...

Страница 14: ...le in step service setting 3 The correction factor needs to be determined empirically with help of a known water sample shift value positive value higher water hardness correction factor higher than 1...

Страница 15: ...analysis delay entered A new analysis is only started if the previous one has been completed For this reason an analysis interval can be greater than that programmed in this sec tion Note If a water...

Страница 16: ...the desired input function for the input INPUT 1 IN1 with the help of the key Stat Start analysis WaMe Water Meter Stop Stop analysis NoIn No Input Rest Reset relay Input IN 2 S t e p n o 3 2 S t a t...

Страница 17: ...a delay time in the range of 1 to 99 sec onds Input function Water meter Water volume 1 between the analyses S t e p n o 4 4 W a t e r v o l 1 1 0 0 c b m Enter the Water volume 1 after which a new a...

Страница 18: ...2 Output OUT 2 S t e p n o 5 2 I M P P S 1 P S 2 A N A S I G O U T 2 P e r m a n e s i g n a l 1 Select according to programme step 5 1 the desired output function for the output OUT2 Output OUT 3 S t...

Страница 19: ...1 or Permanent signal 2 is so programmed that the ana lyser performs no more analyses before the value entered in programme step 6 2 is reached no further signal can be emitted Output function Perman...

Страница 20: ...of the bad messages S t e p n o 6 6 N u m b e r m e s s a g e s 2 You can programme the number of bad messages limit overruns underruns after which the output function is activated Values from 1 to 5...

Страница 21: ...tivation of the fault relay RF Refill indicator VH Measured value too high NI No indicator Stop VL Measured value too low BV Blank value too low 7 Activation of the buzzer S t e p n o 7 1 I N B V V H...

Страница 22: ...dness of the last analysis is continuously dis played The scale of the display value can be programmed To this end a current initial value of 0 mA or 4 mA must be accorded to the hardness value of 0 d...

Страница 23: ...ote the newly entered code number in your documentation Af f f fter ter ter ter a new code number has been entered this programme step cannot be called a new code number has been entered this programm...

Страница 24: ...ion The potentiometer required for calibration is now accessible and can be actuated with the help of a screwdriver ATTENTION Replace the cap after calibration S e r v i c e s t e p n o 2 C a l i b r...

Страница 25: ...il it reaches a predetermined value W a r t u n g S c h r i t t 3 a l t 0 J N n e u 3 0 s a v e E N D E After the titration has finished the old and new determined shift value is displayed Shift the c...

Страница 26: ...eeding Feeding Feeding indicator indicator indicator indicator When commissioning the instrument for the first time the metering pump must be switched on until the indicator flows into the measuring c...

Страница 27: ...wall mounting The brackets can be mounted twisted 90 to the left or right For mounting on a plate the in strument can be mounted from the rear side without brackets Use M5 screws The depth of the thre...

Страница 28: ...OUT 1 OUT 2 Power in Protectiveearth No Nc C No Nc OUT 3 C No Nc IN 1 IN 2 RC 1 RC 2 L1 Power out n1 l1 Pow er output Pow er input Earth conductor Contact input 1 Recorder output 1 PE PE 4 AmT 500 mA...

Страница 29: ...valve with the mains output voltage Inputs The analyser is equipped with 2 identical inputs for floating switching contacts It is only through the programming in the programme steps 3 1 and 3 2 that...

Страница 30: ...ms for the regeneration of treatment plants start contact for central control valves with their own pro gramme controller barrels PLC controls stop signal contacts for osmosis plants and fault alarm s...

Страница 31: ...Programming Programming Programming Programming 1 5 MAX Activation of the horn if the water hardness is exceeded applies to all outputs 5 1 IMP Generation of a pulse signal 5 4 IMP Activation of the...

Страница 32: ...VL Activation on occurrence of the message Internal measurement too low The programming of 1 5 in the case of OUT 1 applies to all outputs Floating fault signal contact at OUT 3 Function Function Func...

Страница 33: ...Function Function The recorder serves to log the activities of the instrument Different current values are allocated to the different activities Programming Programming Programming Programming 8 1 4...

Страница 34: ...e lever and tighten the hose somewhat 3 Removing the measuring chamber a Remove the metering pump hose b Unfasten the solenoid valve connector and remove it c Loosen and remove the sensor connec tors...

Страница 35: ...e sets for maintenance Recommended spare parts for several years 90 142 Maintenance set 01 3x 2 hoses 90161 und 90163 90 362 Measuring chamber cpl without solenoid vale and without intake and outlet p...

Страница 36: ...max 3 Pulse signal Permanent signal 1 Permanent signal 2 Analysis runs Signal relay Analogue outputs 2 Output 1 Status display Analysis active Soft water Hard water Refill indicator and Measurement f...

Отзывы: