SteelCentral™ NetExpress Appliance Installation Guide
29
APPENDIX A
Specifications
This chapter describes:
“Console cable wiring” on page 29
“Controls and indicators” on page 30
“Mechanical and electrical specifications” on page 31
Console cable wiring
The console cable provided in the accessory kit has an RJ45 connector on one end and a 9-pin D-subminiature
connector on the other end. The connectors are wired as follows:
RJ45 Connector
9-pin D-subminiature
Connector
Signal Name
Description
1
8
RTS
Request to send
2
6
DTR
Data terminal ready
3
2
SOUT (TxD)
Serial output (Transmit data)
4
5
GND
Ground
5
5
RI
Ring indicator
6
3
SIN (RxD)
Serial input (Receive data)
7
4
DCD or DSR
Data carrier detect or Data set ready
8
7
CTS
Clear to send
D-subminiature
RJ45
Содержание SteelCentral NetExpress
Страница 1: ...SteelCentral NetExpress Appliance Installation Guide Model SCNE 00470 Version 10 14 x August 2018 ...
Страница 14: ...10 SteelCentral NetExpress Appliance Installation Guide Preparation Licensingstrategy ...
Страница 20: ...16 SteelCentral NetExpress Appliance Installation Guide Configuration Step 2 Log in to the web user interface ...
Страница 30: ...26 SteelCentral NetExpress Appliance Installation Guide Licensing Licensing multiple products ...
Страница 32: ...28 SteelCentral NetExpress Appliance Installation Guide Installation verification ...
Страница 37: ...SteelCentral NetExpress Appliance Installation Guide 33 ...