Rinnai IB35ETRLC Скачать руководство пользователя страница 11

 11

proceed to TIMER 2 - which is
programmed in the same way - or three
times to return to the clock display. This
must be done within 1 minute of setting the
time to lock it into the memory.

The digital display will show the current
time.  A small indicator on the digital display
will flash to show that the display has
returned to the clock.

After setting timer 2 the SET TIMES button
must be pressed once within one minute
of programming to lock in the times and
return to the clock display.

The timers operate over a 24 hour period,
and will activate 7 days a week when set.

OPERATING THE TIMERS

Before operating the timer(s), the clock
time must be correct and a starting time
and finishing time for the timer(s) must be
programmed, 

see page 9.

  Both timers

operate in the same way.

Ignite the  heater and select the preset
temperature as for normal operation.

Press the timer 1 and / or timer 2 button(s).
The timer indicator(s) will glow and the unit
will change to  stand-by mode. The burners
will extinguish and the ON indicator will
change from red to green.  The display will
show the start time for the selected timer
briefly before returning to the clock display.

When the heater is in stand-bys mode, you
can display and change the clock and the
on and off times for both timers in the same
way as described earlier.

The timers can be deactivated by either
pressing the timer button(s) that you want
to deactivate or by turning the heater off
using the ON/OFF button.

NOTE: If there is a power failure, the
system memory will retain the Timer
programs, and the clock will stop at the
time the power goes off. The clock will start

again when the power comes back on, but
the time will be slow by the duration of the
power failure. To set the clock to the
correct time after the power has come
back on, simply follow the instructions on
page 9.

OVERRIDE

This function is intended to be used to
manually override the current operation of
the heater.  For example; If the heater is in
stand-by mode (ie. between finishing time
and starting time of a timer), and the
OVERRIDE button is selected, then the
heater will begin to operate and heat the
room.

Press the OVERRIDE button to activate.
The indicator light will flash when active.

To manually deactivate the OVERRIDE
press the OVERRIDE button again.  The
OVERRIDE indicator will go out, and the
heater will return to stand-by mode.

The heater will continue to operate on
OVERRIDE until the OVERRIDE button is
pressed again, or one of the timers takes
over the operation of the heater.  This
means that the OVERRIDE mode will
automatically turn off if a programmed
starting time is reached.  The heater will
then return to operating at times
programmed into the timer(s).  Turning the
heater off will also deactivate the
OVERRIDE.

REMOTE CONTROL

The remote control can only be used for
manual operation of the heater.  If the
heater is in stand-by (timer) mode then only
the OFF button will work.  Pressing the OFF
button when the heater is in stand-by mode
will deactivate the timers and the heater
can now be operated manually.

 The ON and OFF buttons on the remote
work in the same way as the ON / OFF
button on the control panel as do the  “
   “ and “

“ buttons.

Содержание IB35ETRLC

Страница 1: ...upplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier This appliance is only for use with the type of gas indicated on...

Страница 2: ...the Warranty For the name of the Authorized Distributor or Installer nearest you please contact your local HVAC dealer or gas service technician visit the Rinnai website www rinnai us call Rinnai at...

Страница 3: ...your safety read before operating heater 8 Control panel layout 9 Operation 9 Location 13 Venting 15 Gas connection 15 Log installation 16 Testing and commissioning 17 Maintenance instructions 18 Wiri...

Страница 4: ...er with forced convection and natural draft flue system Gas Control Electronic control valve Burners Ember bed flame and heat burner Warm Air Discharge Top front louvres Flue Natural draft Approved 4...

Страница 5: ...Refer to local gas authority for confirmation of the gas type if you are in doubt Included in the carton Customer operation information IMPORTANT Before using this product please read this manual care...

Страница 6: ...nst the appliance 30 DUE TO HIGH TEMPERATURES THE APPLIANCE SHOULD BE LOCATED OUT OF TRAFFIC AND AWAY FROM FURNITUREAND DRAPERIES 31 CHILDRENANDADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE...

Страница 7: ...Flue Termination Fan Combustion System Ignition System Operation Temperature control Electronic thermostat High Low Off Flame picture select option Up Down buttons Temperature range Low 50 F 60 F 80 F...

Страница 8: ...uctions If you cannot reach your gas supplier call the fire dept C Use only your hand to push the gas control buttons Never use tools If the buttons will not activate by hand don t try and repair it c...

Страница 9: ...ss the ON OFF button OFF then ON again TURNING OFF Simply press the ON OFF button to switch off the unit The ON indicator will go out The convection fan will continue to operate for several minutes af...

Страница 10: ...hen the correct hour shows on the Digital Display Confirm that you have selected AM or PM as required a small indicator on the left hand side of the Digital Display indicates the AM PM setting Use the...

Страница 11: ...failure the system memory will retain the Timer programs and the clock will stop at the time the power goes off The clock will start again when the power comes back on but the time will be slow by th...

Страница 12: ...f the remote control The clip is removed by inserting a coin or similar into the recess in the back of the remote control and sliding downwards The battery must be of type CR 2032 and will only operat...

Страница 13: ...at room ventilation complies with local regulations 7 This heater must be mounted on a hearth not less than 2 thick and at least the width and depth of the heater 8 Installation location shall provide...

Страница 14: ...ns a zero clearance kit must be used Combustible installation This may require a sheet of non combustible material to be laid under the heater or a layer of cement to be poured on the hearth The firep...

Страница 15: ...be installed vertically only If installation prevents this then there must be at least 4 feet of vertical flue before any bends The flue must not fall below horizontal at any stage There must not be m...

Страница 16: ...remove the cover A hole is provided on the right hand side of the junction box for a suitable electrical gland to be attached and the electrical supply to pass through 6 There are two wires one black...

Страница 17: ...ewdriver and remove excess material Note The ember bed material must be placed after the logs are fitted If the logs are to be removed for any reason the ember bed material must be removed first and r...

Страница 18: ...3 It may take approximately 2 hours for the logs to achieve their full flame pattern and glow During the initial burning in period some smoke and smell may be experienced The heater should be run on t...

Страница 19: ...polishes to clean the casing while the fire is in operation Do not damage or distort any part of the heater Do not use wet cloth or spray cleaners on burners VENT MAINTENANCE The flue should be inspec...

Страница 20: ...not to damage the fiber seal on the perimeter of the glass 4 The glass may be cleaned with a damp sponge and soapy water If the seal is damaged it should be replaced Remove any soot deposit from the l...

Страница 21: ...21 WIRING DIAGRAM PCB LAYOUT Caution Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify proper operation after servicing...

Страница 22: ...g up Small soot deposit Normal operation No action required Inadequate fluesystem Log misalignment Call service department agent Incorrect gas pressure Condensationon glass Normal operation Allow fire...

Страница 23: ...block Service call Power failure Service call Room temperature sensor faulty ERROR CODES ERROR CODE MESSAGE The Flame Fire ETR has the ability to check its own operation continuously If a fault occur...

Страница 24: ...24 EXPLODED DIAGRAMS...

Страница 25: ...25...

Страница 26: ...AME 23 2 7875 ELECTRODE 23 2 7520 THERMOCOUPLE 24 2 7876 ELECTRODE NUT S I T 25 2 7872 INJECTOR NG 51 NG 2 7873 INJECTOR LPG 31 LP 27 2 7900 ELECTRODE NUT ETR 28 2 7902 SPACER ELECTRODE PILOT 29 2 798...

Страница 27: ...N PANEL IBR ETR US 76 1 7601 1 FAN GUIDE TOP NAT IB35ETR 77 1 7613 FAN DIVIDING BRKT RH IB35ETR 78 2 7554 CLIP THERMISTER CP 90125 2 B 79 1 7989 REAR PANEL IBR USA 80 1 7197 REAR TOP PANEL IBR 81 1 71...

Страница 28: ...28 INSTALLATION NOTES...

Страница 29: ...29 INSTALLATION NOTES...

Страница 30: ...30 INSTALLATION NOTES...

Страница 31: ...__________________________ Date ___________________ INSTALLATION COMMISSIONING CHECKLIST INSTALLER DETAILS 1 Was a fireplace inspection carried out i e clearances combustibles etc 2 Was a manufactured...

Страница 32: ...Part Number 7919B zx...

Отзывы: