RigMaster LG200 Installation Manual
Section 10
August 2010 RigMaster Power International Ltd LG200 Service Manual
10:2:0
Installing the 200 Amp Battery Fuse
A 200 Amp in-line DC fuse must be installed on the LG200’s positive (+)
battery cable. The fuse assembly kit will be supplied under the following part
numbers:
Description
Part Number
RP7-085
Fuse Kit
Fuse Holder, 18” Cable, Fuse
Fuse Holder with Fuse
RP7-071
200 Amp Fuse
LG7-009
18” positive battery cable
RP7-042
17’ positive battery cable with 5/16” eye terminal
RP7-045
NOTE
The LG200 positive battery cable should be located on a separate battery than
the negative cable. The LG200 positive battery cable should be on an
independent post (i.e. there should be no other line or load terminals connected
to t he s a me s t ud as t h e LG 2 00 ’ s p os it i ve b a tt er y ca bl e) .
200 Amp Fuse
1. Install the battery cables on the LG200 engine
compartment battery studs and route them to the
battery box ensuring that the cables are
protected from any hazards that may damage
them.
200 Amp
2.Once the cables reach the battery box, find a
suitable location to mount the in-line fuse. The
fuse assembly must be located in an area free of
hazards and firmly secured (mounting hardware
not included)
Battery Fuse Housing
Battery Fuse
Base
Figure 10-4
(2) Nuts
(2) Lock Washers
200 Amp Fuse
Содержание MTS-T4-LG200
Страница 1: ...Installation Manual MTS T4 LG200 ...
Страница 59: ...RigMaster LG200 Installation Manual Notes August 2010 RigMaster Power International Ltd LG200 Service Manual ...
Страница 60: ...RigMaster LG200 Installation Manual Notes August 2010 RigMaster Power International Ltd LG200 Service Manual ...
Страница 61: ...RigMaster LG200 Installation Manual Notes August 2010 RigMaster Power International Ltd LG200 Service Manual ...