RigMaster LG200 Installation Manual
Section 11
August 2010 RigMaster Power International Ltd LG200 Service Manual
Start-Up Procedure
Introduction to Start Up Procedures
11:1:0
Operation of the Electronic Control
11:2:0
Cabin Controller LCD Display
11:2:1
Operation of the Cabin Controller (Functions)
11:2:2
AutoStart Features and Operation
11:2:3
Electronic Control Operation and Fault Codes
11:2:4
Pre-Start Inspection
11:3:0
Test the Air Conditioning System
11:4:0
Test the Alternator
11:5:0
Mark the Serial Number Placard
11:6:0
Complete the Installation Check List and Warranty Registration
11:6:1
Diesel Particulate Filter Registration
11:6:2
11:1:0
Introduction
It is important that you ensure all steps are complete before performing the start
up procedure. If you require assistance in completing any of the following steps
see Section 1:1:3 for manufacturers Technical Support information.
11:2:0
Operation of the Electronic Control
Before beginning the start-up procedure it is necessary to know how to operate
the cabin controller.
Figure 11-1
Содержание MTS-T4-LG200
Страница 1: ...Installation Manual MTS T4 LG200 ...
Страница 59: ...RigMaster LG200 Installation Manual Notes August 2010 RigMaster Power International Ltd LG200 Service Manual ...
Страница 60: ...RigMaster LG200 Installation Manual Notes August 2010 RigMaster Power International Ltd LG200 Service Manual ...
Страница 61: ...RigMaster LG200 Installation Manual Notes August 2010 RigMaster Power International Ltd LG200 Service Manual ...