20164541
24
GB
Installation
5.8
Combustion head adjustment
At this point of the installation, the combustion head is fixed to the
boiler as shown in Fig. 15.
It is therefore especially easy to adjust, and this adjustment de-
pends only on the maximum output of the burner.
Two adjustments of the head are foreseen:
–
external air R1
–
central air R2
In the diagram (Fig. 20) find the notch at which to adjust both air
and central air.
External air R2 adjustment
Rotate the screw 4)(Fig. 18 - Fig. 19) until the notch you
have found corresponds with the front surface 5) of the fit-
ting.
Central air R3 adjustment
Loosen the 2 screws 1) and rotate the ring nut 2) until the
notch you have found corresponds with the screw 1).
Block the 2 screws 1).
WARNING
To facilitate adjustment, loosen the screw 6),
adjust and then lock.
2
(R2)
1
3
6
4
(R1)
5
D7675
Fig. 18
Fig. 19
0
1
2
3
5
4
6
(R1)
1
2
(R3)
3
20127192
Содержание RS 160/E O2 BLU
Страница 2: ...Translation of the original instructions...
Страница 44: ...20164541 42 GB Appendix Electrical panel layout 0 1 0 0 1 1 1 1 0 2 0 0 3 3 3 4 3 5 3 3 3 3 3 3 3 3 3 3 4 3...
Страница 45: ...43 20164541 GB Appendix Electrical panel layout...
Страница 46: ...20164541 44 GB Appendix Electrical panel layout 0 0 0 1 2 3 2 3 2 4 2 5 2 2 2 2 2 32 3 2 62 6 6 3 2 2 4 2...
Страница 47: ...45 20164541 GB Appendix Electrical panel layout...
Страница 48: ...20164541 46 GB Appendix Electrical panel layout...
Страница 49: ...47 20164541 GB Appendix Electrical panel layout...
Страница 50: ...20164541 48 GB Appendix Electrical panel layout 0 0 0 0 0 1 1 1 2 1 3 1 1 1 1 1 1 1 41 4 4 1 1 2 1...
Страница 51: ...49 20164541 GB Appendix Electrical panel layout 0 1 0 1 0 2 0 3 0 0 0 0 0 10 1 0 40 4 4 1 0 0 2 0 5...
Страница 55: ...53 20164541 GB Appendix Electrical panel layout 0 1 1 1 1 1 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 0 2 3...
Страница 57: ......
Страница 58: ......
Страница 59: ......