Riello 47-364-52 Скачать руководство пользователя страница 32

32

NOTE

Please refer to 3 - 3E and use the appropriate PPE when 

carrying out any of the actions or procedures contained within 

this section. 

7.1  GENERAL

Once the appliance has been serviced, the benchmark Service 

Record must be completed.

For UK only: It is important that the Benchmark Service Record 

is correctly completed and handed to the user. Failure to install 

and commission the appliance to the manufacturers instructions 

will invalidate the warranty.

To ensure the continued safe and efficient operation of the ap

-

pliance, it is recommended that it is checked and serviced at 

regular intervals. To ensure correct and safe operation of the 

appliance, it is essential that any worn or failed component be 

replaced only with a 

genuine Vokèra spare part

. It should be 

remembered that although certain generic components may 

look similar, they will be specific to an individual appliance or 

product range. Use of non-genuine Vokèra spare parts could 

invalidate your warranty and may pose a potential safety haz-

ard. The frequency of servicing will depend upon the particular 

installation conditions, but in general, once per year should be 

sufficient. It is the law that any servicing work is carried out by 

competent person such as a Vokèra engineer, an approved 

service agent, British Gas, GAS SAFE registered personnel 

or  other  suitably  qualified  personnel. The  following  instruc

-

tions apply to the appliance and its controls, but it should be 

remembered that the central heating and the domestic hot 

water systems would also require attention from time to time.

7  SERVICING INSTRUCTIONS

7.2  ROUTINE ANNUAL SERVICING

•  Check the operation of the appliance and ensure it functions 

as described in section 8.

•  Compare the performance of the appliance with its design 

specification.  The  cause  of  any  noticeable  deterioration 

should be identified and rectified without delay.

•  Thoroughly inspect the appliance for signs of damage or 

deterioration  especially  the  flue  system  and  the  electrical 

apparatus.

•  Check and adjust – if necessary – all burner pressure settings 

(see 8.3).

•  Check and adjust – if necessary – the system design pres-

sure (see 6.11).

•  Carry out an analysis of the flue gases (see 8.3), and visually 

check the condition of the entire flue assembly.

•  Compare the results with the appliance design specification. 

Any deterioration in performance must be identified and recti

-

fied without delay.

•  Check that the main heat exchanger is clean and free from 

any debris or obstruction.

•  Check and clean – if necessary – the condense trap to ensure 

correct operation.

The flame side of the burner is made of state-of-the-art material.

Being fragile:

-  be particularly careful when handling, mounting or disman-

tling the burner and adjacent components (e.g. electrodes, 

insulation panelling etc.)

-  avoid direct contact with any cleaning appliance (e.g. brushes, 

aspirators, blowers, etc.).

This component does not need any maintenance, please do 

not remove it from its housing, except where the O-ring may 

have to be replaced.

The manufacturer declines all responsibility in cases of dam-

ages due to failing to observe the above.

SETTING THE DHW OUTLET TEMPERATURE

The DHW outlet temperature can be adjusted between 37 °C 

- 60 °C via the buttons 

A & B

 (Fig. 1).

6.11  SETTING THE SYSTEM DESIGN 

PRESSURE

The design pressure should be a minimum of 0.5 bar and a 

maximum of 1.5 bar. The actual reading should ideally be 1bar 

plus the equivalent height in metres (0.1 bar = 1 metre) to the 

highest point in the system above the base of the appliance (up 

to the maximum of 1.5 bar total). 

N.B.

 The safety valve is set 

to lift at 3 bar/30 metres/45 psig. To lower the system pressure 

to the required value, drain off some water from the appliance 

drain valve until the pressure is correct.

6.12  REGULATING THE CENTRAL HEATING 

SYSTEM

Fully open all radiator and circuit valves and run the appliance 

for both heating and hot water until heated water is circulating. 

If conditions are warm remove any thermostatic heads. Adjust 

radiator return valves and any branch circuit return valves until 

the individual return temperatures are correct and are approxi-

mately equal.

6.12.1 5.11.1 REGULATING THE DHW FLOW-RATE

The appliance is fitted with a flow rate restrictor that limits the 

maximum flow rate that can be drawn through the appliance.

The restrictor eliminates the need to manually adjust the DHW 

flow rate. However if it is felt necessary to further increase or 

decrease the available flow rate, spare restrictors are available 

from Vokèra spare parts.

The spare flow rate restrictors can be fitted to either increase 

or decrease the maximum flow rate. 

6.12.2 FLOW-RATE RESTRICTOR

The boiler is supplied with the following flow restrictor.

VISION PLUS 25C:

 8 - litres flow restrictor

VISION PLUS 30C: 

11 - litres flow restrictor

6.13  FINAL CHECKS

•  ENSURE ALL TEST NIPPLES ON THE APPLIANCE GAS 

VALVE ARE TIGHT AND CHECKED FOR TIGHTNESS.

•  ENSURE THE APPLIANCE FLUE SYSTEM IS FITTED 

CORRECTLY AND IS PROPERLY SECURED.

•  ENSURE ALL PIPE WORK IS RE-CHECKED FOR TIGHT-

NESS.

•  RE-FIT APPLIANCE CASING.

•  COMPLETE BENCHMARK CHECKLIST.

FOR UK ONLY

Complete details of the boiler, controls, installation and com-

missioning in the Benchmark checklist at the back of this 

book. It is important that the Benchmark checklist is correctly 

completed and handed to the user. Failure to install and com-

mission the appliance to the manufacturers instructions will 

invalidate the warranty.

6.14  INSTRUCTING THE USER

Hand over all documentation supplied with this appliance – 

including these instructions – and explain the importance of 

keeping them in a safe place.

Explain to the user how to isolate the appliance from the gas, 

water and electricity supplies and the locations of all drain 

points. Show the user how to operate the appliance and any 

associated controls correctly.

Show the user the location of the filling valve and how to top-

up the system pressure correctly and show the location of all 

manual air release points.

Explain to the user how to turn off the appliance for both long 

and short periods and advise on the necessary precautions to 

prevent frost damage.

Explain to the user that for continued safe and efficient operation, 

the appliance must be serviced annually by a competent person.

IMPORTANT

To validate the appliance warranty, it’s necessary to register 

the appliance details with us. The warranty can be registered 

in several ways:

•  online at: www.vokera.co.uk (UK) or www.vokera.ie (Ireland)

•  for UK residents by calling: 0800 479 0754

•  for ROI residents by calling: 056 7755 055

Содержание 47-364-52

Страница 1: ...AINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK VISION PLUS High efficie...

Страница 2: ...22 5 OPERATION 23 5 1 ACCESS TO THE PARAMETERS 23 5 2 CONTROL PANEL 23 5 3 SETTINGS MENU TREE STRUCTURE 24 5 4 STARTING THE BOILER 25 5 5 BOILER CONFIGURATION 26 5 6 FIRST COMMISSIONING 28 5 7 VENT CY...

Страница 3: ...inated automatically 1 6a DIMENSIONS VISION PLUS 25C 30C HEIGHT 715 mm WIDTH 405 mm DEPTH 248mm Dear Customer Your Vok ra VISION PLUS boiler has been designed to meet and exceed the very latest standa...

Страница 4: ...indicator Indicates the presence of a flame in the event of a flame lockout the icon looks like Reset It comes on when there are alarms that require a manual reset by the user Enter It comes on when...

Страница 5: ...ns and the segments come on for 1sec and in sequence the firmware revision is displayed for 3sec Then the interface displays the status active at that moment If necessary the interface automatically g...

Страница 6: ...and the burner is lit the icon appears on the display Heating REQUEST the radiator icon blinks Bar 2 3 2a SUMMER MODE Set the boiler to the SUMMER status by pressing key 1 until the domestic hot water...

Страница 7: ...On the 4 digits a message scrolls containing the error code and its description DAY 2 3 8a RESET FUNCTION The RESET icon comes on when there is an alarm that requires a manual reset by the user for e...

Страница 8: ...ngineer 2 6a INFO MENU Pressing key 3 on the display screen displays a list of informa tion regarding the operation of the boiler listed by parameter name and value Passing from the display of one par...

Страница 9: ...DOWN THE SYSTEM FOR SHORT PERIODS The system and boiler can be shut down in the event of temporary absences weekends short breaks etc setting the boiler status to OFF 3a HOW TO While the electrical s...

Страница 10: ...secontactyournearestVok raoffice 4 2a WHAT IF I HAVE FREQUENTLY TO TOP UP THE SYSTEM If the system regularly requires topping up it may be indicative of a leak Please contact your installer and ask hi...

Страница 11: ...mer services VISION PLUS boiler complies with basic requirements of the following Directives Regulation EU 2016 426 Yield directive Article 7 2 and Annex III of directive 92 42 EEC Electromagnetic com...

Страница 12: ...r DHW flow switch Top AAV High limit thermostat Flow temperature sensor Safety valve DHWFilter Automatic by pass Return temperature sensor Water trans ducer Fig 5 2 DESIGN PRINCIPLES AND OPERATING SEQ...

Страница 13: ...25C VISION PLUS 30C Capacity 8 litres Maximum system volume 74 litres Pre charge pressure 1 bar Dimensions VISION PLUS 25C VISION PLUS 30C Height mm 715 Width mm 405 Depth mm 248 Dry weight kg 27 29 C...

Страница 14: ...ed 24 kW Seasonal space heating energy efficiency s 93 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficie...

Страница 15: ...of 600 mm T Below an opening or window on a pitched roof 2000 mm V From a vertical terminal to an adjacent opening window air brick etc call Vokera technical for advice W From a vertical terminal to a...

Страница 16: ...PIPEWORK It is recommended that copper tubing to BS 2871 Part 1 is used in conjunction with soldered capillary joints Where possible pipes should have a gradient to ensure air is carried naturally to...

Страница 17: ...ed socket with a fused 3 pin plug both complying with BS 1363 is acceptable NOTE Note Vokera Ltd cannot guarantee the performance or reliability of the appliance if when it is supplied via an invertor...

Страница 18: ...4E AIR RELEASE POINTS These must be positioned at the highest points in the system where air is likely to be trapped They should be used to expel trapped air and allow complete filling of the system...

Страница 19: ...20132062 2000mm extension 2000mm 20131979 telescopic extension 372 519mm 522 plume management kit 1370mm 20135587 100mm flue brackets 5 N A Fig 12 Using the template A provided with the kit mark and d...

Страница 20: ...ONLY Using the template provided mark and drill a 125mm hole for the passage of the flue pipe The hole should be drilled LEVEL to ensure any condense fluid that forms is allowed to drain back to the a...

Страница 21: ...are located in the groove of the vertical flue connector Both screws C should now be tightened NOTE If more convenient the vertical flue connector can be attachedtotheverticalflueterminal extensionbe...

Страница 22: ...trical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to LIVE supply blue wire to NEUTRAL supply green yellow to EARTH connection Insertthesupplied3 AMPf...

Страница 23: ...d it has the back cancel function A B Access to the domestic hot water comfort functions see para graph 5 8 9 Domestic hot water comfort function C It is normally used to raise the heating water tempe...

Страница 24: ...P4 05 PUMP CONTROL TYPE NOT USED P4 08 OT CASCADE CONTROL NOT AVAILABLE ON THIS MODEL P4 09 SCREED FUNCTION 0 1 INSTALLER 0 P4 10 ANTI CYCLE FUNCTION 0 20min INSTALLER 3min P4 11 RESET CH TIMERS 0 1 I...

Страница 25: ...ITY P8 01 BUS 485 CONFIG 0 1 2 SERVICE 0 P8 03 OT CONFIG 0 1 SERVICE 1 5 4 STARTING THE BOILER Ensure that steps 6 1 through to 6 6 have been completed be fore supplying the gas and electrical supply...

Страница 26: ...oard for calculating the ignition delivery temperature of the burner IGNITION TEMPERATURE HEATING SETPOINT P4 04 The factory setting for this parameter is 3 C it can be changed within the 2 10 C range...

Страница 27: ...eet of the BE16 accessory board for more information about the use of this parameter P4 25 When P4 12 1 this parameter allows you to set the hydraulic configuration of heating zone 1 The factory setti...

Страница 28: ...ntil the icon for the desired function is displayed 5 8 1 WINTER MODE Set the boiler to the WINTER status by pressing key 1 until both the domestic hot water icon and the heating icon are displayed Th...

Страница 29: ...in the preset range in steps of 0 5 C The level bars beside the heating icon show the setpoint value set with respect to the operating range four bars on max setpoint one bar on min setpoint 5 8 7 SAF...

Страница 30: ...t the P4 menu and then P4 09 with the keys confirming the selection with Note SCREED HEATING is not available if the boiler is a status other than OFF To activate the function set the parameter to 1 t...

Страница 31: ...e Drain the boiler and system from the lowest points Open the drain valve full bore to remove any installation debris from the boiler prior to lighting Refill the boiler and heating system as describe...

Страница 32: ...mperature can be adjusted between 37 C 60 C via the buttons A B Fig 1 6 11 SETTING THE SYSTEM DESIGN PRESSURE The design pressure should be a minimum of 0 5 bar and a maximum of 1 5 bar The actual rea...

Страница 33: ...m pump base and lift pump assembly clear of the hydraulic manifold The pump assembly can now be removed from the appliance Replace carefully in the reverse order 7 7 SAFETY VALVE FIG 32 Carry out comp...

Страница 34: ...front cover Disconnect the electrode leads and ancillary wiring from their respective connectors Re move the retaining screws V for electrode Remove the spark ignition electrode W Remove the flame sen...

Страница 35: ...fully withdraw the by pass cartridge S1 and or DHW non return cartridge T1 Ensure all seals are in good condition taking care to ensure they are replaced correctly Replace in the reverse order ensurin...

Страница 36: ...component removal procedure as described in 7 4 Disconnect the electrical plug from the actuator H2 Replace in the reverse order 7 21 4 DHW THERMISTOR FIG 33 Carry out component removal procedure as d...

Страница 37: ...er Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15 minutes The speed of the fan and therefore the output of the boiler is determined...

Страница 38: ...own on the display IMPORTANT The combustion analysis function is active for a maximum time of 15 minutes the burner shuts down if an outlet temperature of 95 C is reached It will ignite again when the...

Страница 39: ...isconnection and re connection of any electrical wiring or component these checks must be repeated 8 7 FAULT FINDING Before attempting any fault finding the electrical checks as detailed in 8 6 must b...

Страница 40: ...14 15 16 17 18 19 20 21 22 23 24 25 26 Giri ven latore r p m Portata termica kW Curva portata termica giri ven latore Caldaia Vision PLUS 25C Qm Qn RANGE RATED HTG curve VISION PLUS 25C heat output kW...

Страница 41: ...0 15 20 CORREZIONE CURVA CLIMATICA CLIMATE CURVE CORRECTION EXTERNAL TEMPERATURE C DELIVERY TEMPERATURE C NIGHT COMPENSATION PARAMETER P4 20 If a ROOM THERMOSTAT is connected to a programming timer fr...

Страница 42: ...his latter is replaced The total hours can be verified in the following way access the INFO menus as indicated in the paragraph 8 15 INFO menu at I0 15 to display the value of the flue gases probe met...

Страница 43: ...n P4 12 1 I0 14 ZONE 1 OUTLET Zone 1 ow sensor value when P4 13 1 I0 15 EXHAUST PROBE HOURS Number of hours the heat exchanger has been operating in condensing mode I0 16 MAIN ZONE SET Main zone deliv...

Страница 44: ...following figure Using the arrows select the day or the pre selected group of days 1 2 3 4 5 6 7 programming of the individual days 1 5 programming from Monday to Friday 6 7 programming from Saturday...

Страница 45: ...er must always be supplied with a permanent 230V electrical supply The room thermostat connection is low voltage 24 Vdc Do not connect any controls or auxiliary equipment to the low voltage terminal s...

Страница 46: ...brown blue CN3 1 2 NOTE L N E connection is advisable 7 1 CN9 D H W T D H W F S red red violet violet t 3 CN4 1 brown heat black D H W blue Heat 3 D H W 1 N 2 3W TSC2 S E N F 3 yellow green blue brown...

Страница 47: ...he boiler to propane gas G31 use the specific accessory kits For disassembly refer to the instructions below remove the power supply to the boiler and close the gas tap remove the casing as indicated...

Страница 48: ...section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES I Is s C CO O 3 35 50 0p pp pm m a an nd d C CO O C CO O2 2 r ra at ti...

Страница 49: ...urers recommendations at least annually This must be carried out by a competent Gas Safe registered engineer The service details should be recorded on the Benchmark Service and Interim Boiler Work Rec...

Страница 50: ...no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced Yes COMBINATION BOILERS ONLY Is th...

Страница 51: ...er name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas r...

Страница 52: ...er name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas r...

Страница 53: ...structions must be provided e g Benchmark Service Record If this condition is not met the period of warranty will extend to only 12 months from date of installation By registering your appliance you w...

Страница 54: ...from a Trading Standards Authority or a Citizen Advice Bureaux Your Personal Details Vok ra takes care of your personal details in order to protect your privacy Below we detail how we use any data you...

Страница 55: ...Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve the right to change specification without prior notice Consumers statutory rights are not affected Company Reg...

Отзывы: