background image

19

NOTE

Please refer to 3 - 3E and use the appropriate PPE when 

carrying out any of the actions or procedures contained within 

this section.

4.1  PREPARATION FOR MOUNTING THE 

APPLIANCE

The appliance should be mounted on a smooth, vertical sur-

face, which must be capable of supporting the full weight of 

the appliance. Care should be exercised when determining the 

position of the appliance with respect to hidden obstructions 

such as pipes, cables, etc.

When the position of the appliance has been decided – using 

the template supplied – carefully mark the position of the wall 

mounting bracket (see Fig. 12

) and flue-hole (if applicable).

Fig. 12   

A

4.2  FITTING THE FLUE

This appliance incorporates a ‘click-fit’ flue connection at the top 

of the appliance, and also incorporates a rear-flue connection.

Should the rear-flue connection be preferred, the flue outlet will 

require to be re-configured from a top outlet to a rear outlet.

Please refer to section 4.6.1.2 and the instructions supplied 

with the rear-flue kit (code 29450133) on how to re-configure 

the flue outlet and how to install the rear-flue terminal.

4.2.1  CONCENTRIC HORIZONTAL FLUE

These instructions relate specifically to the installation of this 

appliance  with  the  Vokera  60/100mm  ‘X-type’  (click-fit)  flue 

terminals accessories. For specific instructions on installing this 

appliance with an alternative Vokera flue system, e.g. 80/125mm; 

please refer to the instructions supplied with the specific flue 

system, or download the instructions from the Vokera website. 

The appliance flue outlet elbow can be rotated through 360º on 

its vertical axis. In addition the flue may be extended from the 

outlet elbow in the horizontal plane. A reduction must also be 

made to the maximum length (see table below) when additional 

bends are used.

Reduction for additional bends

Bend 

Reduction in maximum flue length for each bend

45º bend

1.0 metre

90º bend

1.0 metre 

Horizontal flue terminals and accessories

Part No.

Description 

Length

20122759

Standard horizontal flue Kit

900mm

20122761

Telescopic flue kit

700mm

20132059

90-degree bend

N/A

20132058

45-degree bend (2)

N/A

20132060

500mm extension

500mm

20132061

1000mm extension

1000mm

20132062

2000mm extension

2000mm

20131979

telescopic extension

372/519mm

522

plume management kit

1370mm

20135587

100mm flue brackets (5)

N/A

Fig. 12

: Usin

g the template (

A

) provided with the kit, mark and 

drill a 125mm hole for the passage of the flue pipe. The hole 

should be drilled to ensure any condense fluid that forms, is 

allowed to drain back to the appliance. The fixing holes for the 

wall-mounting bracket should now be drilled and plugged, an 

appropriate type and quantity of fixing should be used to ensure 

that the bracket is mounted securely. Once the bracket has 

been secured to the wall, mount the appliance onto the bracket.

NOTE PRE-FIXING JIG

A ‘Pre-fixing Jig’ is available as an accessory (code 20177531), 

should it be necessary to pre-fabricate the appliance pipework, 

i.e. first-fix, prior to installing the appliance.

4.2.2  FITTING THE TELESCOPIC HORIZONTAL FLUE 

KIT

In some instances it may necessary to cut the inner 60mm pipe 

of the flue bend at the point indicated 

(Fig. 15 - pos. 

A

) to allow 

for easier insertion to the boiler flue spigot.

Terminal or 

extension

Outer clamps

4.2.3  FITTING THE HORIZONTAL FLUE KIT

Carefully measure the distance from the centre of the appliance 

flue outlet to the edge of the finished outside wall (dimension 

X). Add 65mm to dimension X to give you Dimension Y (see 

Fig. 14). Measure dimension Y from the terminal end of the 

concentric flue pipe and cut off the excess ensuring any burrs are 

removed. Pass the concentric flue pipe through the previously 

drilled hole. Fit the flue bend to the boiler flue outlet and insert 

the concentric flue pipe into the flue bend ensuring the correct 

seal is made.

 

NOTE (Fig. 22): 

The appliance  incorporates  a ‘click-fit’ flue 

connection. Ensure that both screws ‘C’ on the ‘click-fit’ have 

been slackened off. Ensure that the connector is correctly aligned 

with the ‘click-fit’ and insert it into the ‘click-fit’ until it clicks into 

position (this is when the tabs at points ‘A’ are located in the 

groove of the flue bend connector). Both screws (C) should 

now be tightened.

NOTE

Fit the internal (white) trim to the flue assembly prior to connecting 

the flue pipe to the bend.

You must ensure that the entire flue system is properly supported 

and  connected.  Seal  the  flue  assembly  to  the  wall  using 

cement or a suitable alternative that will provide satisfactory 

weatherproofing. The exterior trim can now be fitted.

4  INSTALLATION

Fig. 13   

Содержание 47-364-52

Страница 1: ...AINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK VISION PLUS High efficie...

Страница 2: ...22 5 OPERATION 23 5 1 ACCESS TO THE PARAMETERS 23 5 2 CONTROL PANEL 23 5 3 SETTINGS MENU TREE STRUCTURE 24 5 4 STARTING THE BOILER 25 5 5 BOILER CONFIGURATION 26 5 6 FIRST COMMISSIONING 28 5 7 VENT CY...

Страница 3: ...inated automatically 1 6a DIMENSIONS VISION PLUS 25C 30C HEIGHT 715 mm WIDTH 405 mm DEPTH 248mm Dear Customer Your Vok ra VISION PLUS boiler has been designed to meet and exceed the very latest standa...

Страница 4: ...indicator Indicates the presence of a flame in the event of a flame lockout the icon looks like Reset It comes on when there are alarms that require a manual reset by the user Enter It comes on when...

Страница 5: ...ns and the segments come on for 1sec and in sequence the firmware revision is displayed for 3sec Then the interface displays the status active at that moment If necessary the interface automatically g...

Страница 6: ...and the burner is lit the icon appears on the display Heating REQUEST the radiator icon blinks Bar 2 3 2a SUMMER MODE Set the boiler to the SUMMER status by pressing key 1 until the domestic hot water...

Страница 7: ...On the 4 digits a message scrolls containing the error code and its description DAY 2 3 8a RESET FUNCTION The RESET icon comes on when there is an alarm that requires a manual reset by the user for e...

Страница 8: ...ngineer 2 6a INFO MENU Pressing key 3 on the display screen displays a list of informa tion regarding the operation of the boiler listed by parameter name and value Passing from the display of one par...

Страница 9: ...DOWN THE SYSTEM FOR SHORT PERIODS The system and boiler can be shut down in the event of temporary absences weekends short breaks etc setting the boiler status to OFF 3a HOW TO While the electrical s...

Страница 10: ...secontactyournearestVok raoffice 4 2a WHAT IF I HAVE FREQUENTLY TO TOP UP THE SYSTEM If the system regularly requires topping up it may be indicative of a leak Please contact your installer and ask hi...

Страница 11: ...mer services VISION PLUS boiler complies with basic requirements of the following Directives Regulation EU 2016 426 Yield directive Article 7 2 and Annex III of directive 92 42 EEC Electromagnetic com...

Страница 12: ...r DHW flow switch Top AAV High limit thermostat Flow temperature sensor Safety valve DHWFilter Automatic by pass Return temperature sensor Water trans ducer Fig 5 2 DESIGN PRINCIPLES AND OPERATING SEQ...

Страница 13: ...25C VISION PLUS 30C Capacity 8 litres Maximum system volume 74 litres Pre charge pressure 1 bar Dimensions VISION PLUS 25C VISION PLUS 30C Height mm 715 Width mm 405 Depth mm 248 Dry weight kg 27 29 C...

Страница 14: ...ed 24 kW Seasonal space heating energy efficiency s 93 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficie...

Страница 15: ...of 600 mm T Below an opening or window on a pitched roof 2000 mm V From a vertical terminal to an adjacent opening window air brick etc call Vokera technical for advice W From a vertical terminal to a...

Страница 16: ...PIPEWORK It is recommended that copper tubing to BS 2871 Part 1 is used in conjunction with soldered capillary joints Where possible pipes should have a gradient to ensure air is carried naturally to...

Страница 17: ...ed socket with a fused 3 pin plug both complying with BS 1363 is acceptable NOTE Note Vokera Ltd cannot guarantee the performance or reliability of the appliance if when it is supplied via an invertor...

Страница 18: ...4E AIR RELEASE POINTS These must be positioned at the highest points in the system where air is likely to be trapped They should be used to expel trapped air and allow complete filling of the system...

Страница 19: ...20132062 2000mm extension 2000mm 20131979 telescopic extension 372 519mm 522 plume management kit 1370mm 20135587 100mm flue brackets 5 N A Fig 12 Using the template A provided with the kit mark and d...

Страница 20: ...ONLY Using the template provided mark and drill a 125mm hole for the passage of the flue pipe The hole should be drilled LEVEL to ensure any condense fluid that forms is allowed to drain back to the a...

Страница 21: ...are located in the groove of the vertical flue connector Both screws C should now be tightened NOTE If more convenient the vertical flue connector can be attachedtotheverticalflueterminal extensionbe...

Страница 22: ...trical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to LIVE supply blue wire to NEUTRAL supply green yellow to EARTH connection Insertthesupplied3 AMPf...

Страница 23: ...d it has the back cancel function A B Access to the domestic hot water comfort functions see para graph 5 8 9 Domestic hot water comfort function C It is normally used to raise the heating water tempe...

Страница 24: ...P4 05 PUMP CONTROL TYPE NOT USED P4 08 OT CASCADE CONTROL NOT AVAILABLE ON THIS MODEL P4 09 SCREED FUNCTION 0 1 INSTALLER 0 P4 10 ANTI CYCLE FUNCTION 0 20min INSTALLER 3min P4 11 RESET CH TIMERS 0 1 I...

Страница 25: ...ITY P8 01 BUS 485 CONFIG 0 1 2 SERVICE 0 P8 03 OT CONFIG 0 1 SERVICE 1 5 4 STARTING THE BOILER Ensure that steps 6 1 through to 6 6 have been completed be fore supplying the gas and electrical supply...

Страница 26: ...oard for calculating the ignition delivery temperature of the burner IGNITION TEMPERATURE HEATING SETPOINT P4 04 The factory setting for this parameter is 3 C it can be changed within the 2 10 C range...

Страница 27: ...eet of the BE16 accessory board for more information about the use of this parameter P4 25 When P4 12 1 this parameter allows you to set the hydraulic configuration of heating zone 1 The factory setti...

Страница 28: ...ntil the icon for the desired function is displayed 5 8 1 WINTER MODE Set the boiler to the WINTER status by pressing key 1 until both the domestic hot water icon and the heating icon are displayed Th...

Страница 29: ...in the preset range in steps of 0 5 C The level bars beside the heating icon show the setpoint value set with respect to the operating range four bars on max setpoint one bar on min setpoint 5 8 7 SAF...

Страница 30: ...t the P4 menu and then P4 09 with the keys confirming the selection with Note SCREED HEATING is not available if the boiler is a status other than OFF To activate the function set the parameter to 1 t...

Страница 31: ...e Drain the boiler and system from the lowest points Open the drain valve full bore to remove any installation debris from the boiler prior to lighting Refill the boiler and heating system as describe...

Страница 32: ...mperature can be adjusted between 37 C 60 C via the buttons A B Fig 1 6 11 SETTING THE SYSTEM DESIGN PRESSURE The design pressure should be a minimum of 0 5 bar and a maximum of 1 5 bar The actual rea...

Страница 33: ...m pump base and lift pump assembly clear of the hydraulic manifold The pump assembly can now be removed from the appliance Replace carefully in the reverse order 7 7 SAFETY VALVE FIG 32 Carry out comp...

Страница 34: ...front cover Disconnect the electrode leads and ancillary wiring from their respective connectors Re move the retaining screws V for electrode Remove the spark ignition electrode W Remove the flame sen...

Страница 35: ...fully withdraw the by pass cartridge S1 and or DHW non return cartridge T1 Ensure all seals are in good condition taking care to ensure they are replaced correctly Replace in the reverse order ensurin...

Страница 36: ...component removal procedure as described in 7 4 Disconnect the electrical plug from the actuator H2 Replace in the reverse order 7 21 4 DHW THERMISTOR FIG 33 Carry out component removal procedure as d...

Страница 37: ...er Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15 minutes The speed of the fan and therefore the output of the boiler is determined...

Страница 38: ...own on the display IMPORTANT The combustion analysis function is active for a maximum time of 15 minutes the burner shuts down if an outlet temperature of 95 C is reached It will ignite again when the...

Страница 39: ...isconnection and re connection of any electrical wiring or component these checks must be repeated 8 7 FAULT FINDING Before attempting any fault finding the electrical checks as detailed in 8 6 must b...

Страница 40: ...14 15 16 17 18 19 20 21 22 23 24 25 26 Giri ven latore r p m Portata termica kW Curva portata termica giri ven latore Caldaia Vision PLUS 25C Qm Qn RANGE RATED HTG curve VISION PLUS 25C heat output kW...

Страница 41: ...0 15 20 CORREZIONE CURVA CLIMATICA CLIMATE CURVE CORRECTION EXTERNAL TEMPERATURE C DELIVERY TEMPERATURE C NIGHT COMPENSATION PARAMETER P4 20 If a ROOM THERMOSTAT is connected to a programming timer fr...

Страница 42: ...his latter is replaced The total hours can be verified in the following way access the INFO menus as indicated in the paragraph 8 15 INFO menu at I0 15 to display the value of the flue gases probe met...

Страница 43: ...n P4 12 1 I0 14 ZONE 1 OUTLET Zone 1 ow sensor value when P4 13 1 I0 15 EXHAUST PROBE HOURS Number of hours the heat exchanger has been operating in condensing mode I0 16 MAIN ZONE SET Main zone deliv...

Страница 44: ...following figure Using the arrows select the day or the pre selected group of days 1 2 3 4 5 6 7 programming of the individual days 1 5 programming from Monday to Friday 6 7 programming from Saturday...

Страница 45: ...er must always be supplied with a permanent 230V electrical supply The room thermostat connection is low voltage 24 Vdc Do not connect any controls or auxiliary equipment to the low voltage terminal s...

Страница 46: ...brown blue CN3 1 2 NOTE L N E connection is advisable 7 1 CN9 D H W T D H W F S red red violet violet t 3 CN4 1 brown heat black D H W blue Heat 3 D H W 1 N 2 3W TSC2 S E N F 3 yellow green blue brown...

Страница 47: ...he boiler to propane gas G31 use the specific accessory kits For disassembly refer to the instructions below remove the power supply to the boiler and close the gas tap remove the casing as indicated...

Страница 48: ...section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES I Is s C CO O 3 35 50 0p pp pm m a an nd d C CO O C CO O2 2 r ra at ti...

Страница 49: ...urers recommendations at least annually This must be carried out by a competent Gas Safe registered engineer The service details should be recorded on the Benchmark Service and Interim Boiler Work Rec...

Страница 50: ...no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced Yes COMBINATION BOILERS ONLY Is th...

Страница 51: ...er name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas r...

Страница 52: ...er name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas r...

Страница 53: ...structions must be provided e g Benchmark Service Record If this condition is not met the period of warranty will extend to only 12 months from date of installation By registering your appliance you w...

Страница 54: ...from a Trading Standards Authority or a Citizen Advice Bureaux Your Personal Details Vok ra takes care of your personal details in order to protect your privacy Below we detail how we use any data you...

Страница 55: ...Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve the right to change specification without prior notice Consumers statutory rights are not affected Company Reg...

Отзывы: