background image

1a 

THINGS YOU SHOULD KNOW 

3

1.1A  GAS APPLIANCES 

3

1.2A  ELECTRICAL SUPPLY 

3

1.3A  WARRANTY REGISTRATION 

3

1.4A  APPLIANCE COMMISSIONING CHECKLIST (UK ONLY) 

3

1.5A  HOW DOES IT WORK? 

3

1.6A DIMENSIONS 3

1.7A  CLEARANCES REQUIRED 

3

1.8A  FROST PROTECTION SYSTEM 

3

1.9A  CONTROL PANEL 

4

2a 

GETTING STARTED 

5

2.1A  PARAMETERS ACCESS 

5

2.2A  PROGRAMMING THE BOILER 

5

2.3A  OPERATING MODE 

6

2.4A OTBus REMOTE CONTROL CONNECTION 

7

2.5A  BOILER FAULT CODES 

8

2.6A  INFO MENU 

8

3a 

HOW TO...   

9

3.1A  HOW TO TOP-UP THE SYSTEM PRESSURE 

9

3.2A  HOW TO RESET THE APPLIANCE 

9

3.3A  HOW TO SHUT DOWN THE SYSTEM FOR SHORT PERIODS 9

3.4A  HOW TO SHUT DOWN THE SYSTEM FOR LONG PERIODS   9

3.5A  HOW TO CARE FOR THE APPLIANCE  

9

3.6A  KEYBOARD LOCKOUT FUNCTION  

9

4a 

WHAT IF... 

10

4.1A  WHAT IF I SUSPECT A GAS LEAK 

10

4.2A  WHAT IF I HAVE FREQUENTLY TO TOP-UP THE SYSTEM  10

4.3A  WHAT IF THE APPLIANCE IS DUE ITS ANNUAL SERVICE   10

4.4A  WHAT IF I NEED TO CALL AN ENGINEER 

10

3.7A  INTERFACE STAND BY 

10

1 INTRODUCTION 

11

DESIGN PRINCIPLES AND OPERATING SEQUENCE 

12

2.1 

PRINCIPLE COMPONENTS 

12

2.2 

MODE OF OPERATION (AT REST) 

12

2.3 

MODE OF OPERATION (HEATING) 

12

2.4 

MODE OF OPERATION (HOT WATER) 

12

2.5 

SAFETY DEVICES 

12

2.6 

TECHNICAL DATA 

13

2.7 

VARIABLE SPEED CIRCULATOR 

15

2.8 

HOW TO FREE THE PUMP  

15

GENERAL REQUIREMENTS (UK) 

16

3.1 

RELATED DOCUMENTS 

16

3.2 

LOCATION OF APPLIANCE 

16

3.3 

GAS SUPPLY 

16

3.4 

FLUE SYSTEM 

16

3.5 

AIR SUPPLY 

16

3.6 

WATER CIRCULATION 

16

3.7 

ELECTRICAL SUPPLY 

17

3.8 

MOUNTING ON A COMBUSTIBLE SURFACE 

17

3.9 

TIMBER FRAMED BUILDINGS 

17

3.10  WATER TREATMENT 

17

3.11 SHOWERS 

17

3E 

GENERAL REQUIREMENTS (EIRE) 

17

3.1E  RELATED DOCUMENTS 

17

3.2E  LOCATION OF APPLIANCE 

17

3.3E  GAS SUPPLY 

18

3.4E  FLUE SYSTEM 

18

3.5E  AIR SUPPLY 

18

3.6E  WATER CIRCULATION 

18

3.7E  ELECTRICAL SUPPLY 

18

3.8E  MOUNTING ON A COMBUSTIBLE SURFACE 

18

3.9E  TIMBER FRAMED BUILDINGS 

18

3.10E  WATER TREATMENT 

18

3.11E   SHOWERS 

18

3.12E  DECLARATION OF CONFORMITY 

18

4 INSTALLATION 

19

4.1 

PREPARATION FOR MOUNTING THE APPLIANCE 

19

4.2 

FITTING THE FLUE 

19

4.3 

CONNECTING THE GAS AND WATER (FIG. 22) 

21

4.4 

ELECTRICAL CONNECTIONS 

22

4.5 

CASING REMOVAL  

22

4.6 

APPLIANCE TERMINAL BLOCK 

22

4.7 

CONNECTING THE MAINS (230V) INPUT  

22

5 OPERATION 

23

5.1 

ACCESS TO THE PARAMETERS  

23

5.2 

CONTROL PANEL 

23

5.3 

SETTINGS MENU TREE STRUCTURE 

24

5.4 

STARTING THE BOILER 

25

5.5 

BOILER CONFIGURATION 

26

5.6 

FIRST COMMISSIONING 

28

5.7 

VENT CYCLE 

28

5.8 

OPERATING STATUS 

28

6 COMMISSIONING 

31

6.1 

GAS SUPPLY INSTALLATION  

31

6.2 

THE HEATING SYSTEM 

31

6.3 

HOW TO FILL THE CONDENSATE TRAP 

31

6.4 INITIAL FILLING OF THE SYSTEM 

31

6.5 

INITIAL FLUSHING OF THE SYSTEM 

31

6.6 

PRE-OPERATION CHECKS 

31

6.7 

INITIAL LIGHTING 

31

6.8 

CHECKING GAS PRESSURE AND COMBUSTION ANALYSIS 31

6.9 

FINAL FLUSHING OF THE HEATING SYSTEM 

31

6.10  SETTING THE FLOW OUTLET TEMPERATURE 

31

6.11  SETTING THE SYSTEM DESIGN PRESSURE 

32

6.12 REGULATING THE CENTRAL HEATING SYSTEM 

32

6.13  FINAL CHECKS 

32

6.14  INSTRUCTING THE USER 

32

SERVICING INSTRUCTIONS 

32

7.1 GENERAL 

32

7.2 

ROUTINE ANNUAL SERVICING 

32

7.3 

REPLACEMENT OF COMPONENTS 

33

7.4 

COMPONENT REMOVAL PROCEDURE 

33

7.5 

FRONT COVER REMOVAL

 (FIG. 27) 

33

7.6 

PUMP ASSEMBLY 

(FIG. 28) 

33

7.7 

SAFETY VALVE 

(FIG. 29) 

33

7.8 

LOWER AUTOMATIC AIR RELEASE VALVE 

(FIG. 28) 

33

7.9 

WATER PRESSURE TRANSDUCER 

(FIG. 30) 

33

7.10  FLOW THERMISTOR 

(FIG. 4 - POS. 21) 

33

7.11  RETURN THERMISTOR

 (FIG. 4 - POS. 23) 

33

7.12  PRINTED CIRCUIT BOARD 

(FIG. 31) 

33

7.13  GAS VALVE 

(FIG. 32) 

34

7.14 ELECTRODES 

(FIG. 33 - FIG. 34) 

34

7.15  FLUE FAN & MIXER 

(FIG. 34 - FIG. 35) 

34

7.16 BURNER 

(FIG. 34) 

34

7.17  MAIN HEAT EXCHANGER 

(FIG. 35) 

35

7.18  AUTOMATIC BY-PASS & DHW NON-RETURN 

(FIG. 36) 

35

7.19  EXPANSION VESSEL REMOVAL

 (FIG. 37) 

35

7.20  CONDENSE TRAP REMOVAL 

(FIG. 38) 

35

7.21  FLUE COLLECTOR REMOVAL

 (FIG. 39) 

36

7.22  REPLACING INTERFACE 

36

7.23  REPLACING PCB OR INTERFACE 

36

CHECKS, ADJUSTMENTS AND FAULT FINDING 

37

8.1 

CHECKING APPLIANCE OPERATION 

37

8.2 

APPLIANCE MODES OF OPERATION 

37

8.3 

CHECKING THE CO

2

 AND ADJUSTING THE GAS VALVE  37

8.4 

CHECKING THE EXPANSION VESSEL 

38

8.5 

EXTERNAL FAULTS 

38

8.6 

ELECTRICAL CHECKS 

39

8.7 

FAULT FINDING 

39

8.8 

COMPONENT VALUES & CHARACTERISTICS 

39

8.9 ADJUSTMENTS 

39

8.10  GAS VALVE CALIBRATION 

40

8.11  RANGE RATED 

40

8.12  SETTING THE THERMOREGULATION 

40

8.13  LIGHTS AND FAULTS 

41

8.14  BOILER FAULT CODES 

42

8.15  INFO MENU 

43

8.16  EMBEDDED CLOCK 

44

8.17  CLOCK FUNCTIONALITY 

44

8.18  PROGRAMMING THE EMBEDDED CLOCK 

44

WIRING DIAGRAMS 

45

9.1 

EXTERNAL WIRING 

45

9.2 

OTHER DEVICES 

45

9.3 

OTBUS CONNECTION 

45

10 

LPG INSTRUCTIONS 

47

10.1  RELATED DOCUMENTS 

47

10.2  TECHNICAL DATA 

47

10.3  GAS CONVERSION 

47

10.4 COMPLETION 

47

Содержание 47-364-52

Страница 1: ...AINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK VISION PLUS High efficie...

Страница 2: ...22 5 OPERATION 23 5 1 ACCESS TO THE PARAMETERS 23 5 2 CONTROL PANEL 23 5 3 SETTINGS MENU TREE STRUCTURE 24 5 4 STARTING THE BOILER 25 5 5 BOILER CONFIGURATION 26 5 6 FIRST COMMISSIONING 28 5 7 VENT CY...

Страница 3: ...inated automatically 1 6a DIMENSIONS VISION PLUS 25C 30C HEIGHT 715 mm WIDTH 405 mm DEPTH 248mm Dear Customer Your Vok ra VISION PLUS boiler has been designed to meet and exceed the very latest standa...

Страница 4: ...indicator Indicates the presence of a flame in the event of a flame lockout the icon looks like Reset It comes on when there are alarms that require a manual reset by the user Enter It comes on when...

Страница 5: ...ns and the segments come on for 1sec and in sequence the firmware revision is displayed for 3sec Then the interface displays the status active at that moment If necessary the interface automatically g...

Страница 6: ...and the burner is lit the icon appears on the display Heating REQUEST the radiator icon blinks Bar 2 3 2a SUMMER MODE Set the boiler to the SUMMER status by pressing key 1 until the domestic hot water...

Страница 7: ...On the 4 digits a message scrolls containing the error code and its description DAY 2 3 8a RESET FUNCTION The RESET icon comes on when there is an alarm that requires a manual reset by the user for e...

Страница 8: ...ngineer 2 6a INFO MENU Pressing key 3 on the display screen displays a list of informa tion regarding the operation of the boiler listed by parameter name and value Passing from the display of one par...

Страница 9: ...DOWN THE SYSTEM FOR SHORT PERIODS The system and boiler can be shut down in the event of temporary absences weekends short breaks etc setting the boiler status to OFF 3a HOW TO While the electrical s...

Страница 10: ...secontactyournearestVok raoffice 4 2a WHAT IF I HAVE FREQUENTLY TO TOP UP THE SYSTEM If the system regularly requires topping up it may be indicative of a leak Please contact your installer and ask hi...

Страница 11: ...mer services VISION PLUS boiler complies with basic requirements of the following Directives Regulation EU 2016 426 Yield directive Article 7 2 and Annex III of directive 92 42 EEC Electromagnetic com...

Страница 12: ...r DHW flow switch Top AAV High limit thermostat Flow temperature sensor Safety valve DHWFilter Automatic by pass Return temperature sensor Water trans ducer Fig 5 2 DESIGN PRINCIPLES AND OPERATING SEQ...

Страница 13: ...25C VISION PLUS 30C Capacity 8 litres Maximum system volume 74 litres Pre charge pressure 1 bar Dimensions VISION PLUS 25C VISION PLUS 30C Height mm 715 Width mm 405 Depth mm 248 Dry weight kg 27 29 C...

Страница 14: ...ed 24 kW Seasonal space heating energy efficiency s 93 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficie...

Страница 15: ...of 600 mm T Below an opening or window on a pitched roof 2000 mm V From a vertical terminal to an adjacent opening window air brick etc call Vokera technical for advice W From a vertical terminal to a...

Страница 16: ...PIPEWORK It is recommended that copper tubing to BS 2871 Part 1 is used in conjunction with soldered capillary joints Where possible pipes should have a gradient to ensure air is carried naturally to...

Страница 17: ...ed socket with a fused 3 pin plug both complying with BS 1363 is acceptable NOTE Note Vokera Ltd cannot guarantee the performance or reliability of the appliance if when it is supplied via an invertor...

Страница 18: ...4E AIR RELEASE POINTS These must be positioned at the highest points in the system where air is likely to be trapped They should be used to expel trapped air and allow complete filling of the system...

Страница 19: ...20132062 2000mm extension 2000mm 20131979 telescopic extension 372 519mm 522 plume management kit 1370mm 20135587 100mm flue brackets 5 N A Fig 12 Using the template A provided with the kit mark and d...

Страница 20: ...ONLY Using the template provided mark and drill a 125mm hole for the passage of the flue pipe The hole should be drilled LEVEL to ensure any condense fluid that forms is allowed to drain back to the a...

Страница 21: ...are located in the groove of the vertical flue connector Both screws C should now be tightened NOTE If more convenient the vertical flue connector can be attachedtotheverticalflueterminal extensionbe...

Страница 22: ...trical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to LIVE supply blue wire to NEUTRAL supply green yellow to EARTH connection Insertthesupplied3 AMPf...

Страница 23: ...d it has the back cancel function A B Access to the domestic hot water comfort functions see para graph 5 8 9 Domestic hot water comfort function C It is normally used to raise the heating water tempe...

Страница 24: ...P4 05 PUMP CONTROL TYPE NOT USED P4 08 OT CASCADE CONTROL NOT AVAILABLE ON THIS MODEL P4 09 SCREED FUNCTION 0 1 INSTALLER 0 P4 10 ANTI CYCLE FUNCTION 0 20min INSTALLER 3min P4 11 RESET CH TIMERS 0 1 I...

Страница 25: ...ITY P8 01 BUS 485 CONFIG 0 1 2 SERVICE 0 P8 03 OT CONFIG 0 1 SERVICE 1 5 4 STARTING THE BOILER Ensure that steps 6 1 through to 6 6 have been completed be fore supplying the gas and electrical supply...

Страница 26: ...oard for calculating the ignition delivery temperature of the burner IGNITION TEMPERATURE HEATING SETPOINT P4 04 The factory setting for this parameter is 3 C it can be changed within the 2 10 C range...

Страница 27: ...eet of the BE16 accessory board for more information about the use of this parameter P4 25 When P4 12 1 this parameter allows you to set the hydraulic configuration of heating zone 1 The factory setti...

Страница 28: ...ntil the icon for the desired function is displayed 5 8 1 WINTER MODE Set the boiler to the WINTER status by pressing key 1 until both the domestic hot water icon and the heating icon are displayed Th...

Страница 29: ...in the preset range in steps of 0 5 C The level bars beside the heating icon show the setpoint value set with respect to the operating range four bars on max setpoint one bar on min setpoint 5 8 7 SAF...

Страница 30: ...t the P4 menu and then P4 09 with the keys confirming the selection with Note SCREED HEATING is not available if the boiler is a status other than OFF To activate the function set the parameter to 1 t...

Страница 31: ...e Drain the boiler and system from the lowest points Open the drain valve full bore to remove any installation debris from the boiler prior to lighting Refill the boiler and heating system as describe...

Страница 32: ...mperature can be adjusted between 37 C 60 C via the buttons A B Fig 1 6 11 SETTING THE SYSTEM DESIGN PRESSURE The design pressure should be a minimum of 0 5 bar and a maximum of 1 5 bar The actual rea...

Страница 33: ...m pump base and lift pump assembly clear of the hydraulic manifold The pump assembly can now be removed from the appliance Replace carefully in the reverse order 7 7 SAFETY VALVE FIG 32 Carry out comp...

Страница 34: ...front cover Disconnect the electrode leads and ancillary wiring from their respective connectors Re move the retaining screws V for electrode Remove the spark ignition electrode W Remove the flame sen...

Страница 35: ...fully withdraw the by pass cartridge S1 and or DHW non return cartridge T1 Ensure all seals are in good condition taking care to ensure they are replaced correctly Replace in the reverse order ensurin...

Страница 36: ...component removal procedure as described in 7 4 Disconnect the electrical plug from the actuator H2 Replace in the reverse order 7 21 4 DHW THERMISTOR FIG 33 Carry out component removal procedure as d...

Страница 37: ...er Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15 minutes The speed of the fan and therefore the output of the boiler is determined...

Страница 38: ...own on the display IMPORTANT The combustion analysis function is active for a maximum time of 15 minutes the burner shuts down if an outlet temperature of 95 C is reached It will ignite again when the...

Страница 39: ...isconnection and re connection of any electrical wiring or component these checks must be repeated 8 7 FAULT FINDING Before attempting any fault finding the electrical checks as detailed in 8 6 must b...

Страница 40: ...14 15 16 17 18 19 20 21 22 23 24 25 26 Giri ven latore r p m Portata termica kW Curva portata termica giri ven latore Caldaia Vision PLUS 25C Qm Qn RANGE RATED HTG curve VISION PLUS 25C heat output kW...

Страница 41: ...0 15 20 CORREZIONE CURVA CLIMATICA CLIMATE CURVE CORRECTION EXTERNAL TEMPERATURE C DELIVERY TEMPERATURE C NIGHT COMPENSATION PARAMETER P4 20 If a ROOM THERMOSTAT is connected to a programming timer fr...

Страница 42: ...his latter is replaced The total hours can be verified in the following way access the INFO menus as indicated in the paragraph 8 15 INFO menu at I0 15 to display the value of the flue gases probe met...

Страница 43: ...n P4 12 1 I0 14 ZONE 1 OUTLET Zone 1 ow sensor value when P4 13 1 I0 15 EXHAUST PROBE HOURS Number of hours the heat exchanger has been operating in condensing mode I0 16 MAIN ZONE SET Main zone deliv...

Страница 44: ...following figure Using the arrows select the day or the pre selected group of days 1 2 3 4 5 6 7 programming of the individual days 1 5 programming from Monday to Friday 6 7 programming from Saturday...

Страница 45: ...er must always be supplied with a permanent 230V electrical supply The room thermostat connection is low voltage 24 Vdc Do not connect any controls or auxiliary equipment to the low voltage terminal s...

Страница 46: ...brown blue CN3 1 2 NOTE L N E connection is advisable 7 1 CN9 D H W T D H W F S red red violet violet t 3 CN4 1 brown heat black D H W blue Heat 3 D H W 1 N 2 3W TSC2 S E N F 3 yellow green blue brown...

Страница 47: ...he boiler to propane gas G31 use the specific accessory kits For disassembly refer to the instructions below remove the power supply to the boiler and close the gas tap remove the casing as indicated...

Страница 48: ...section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES I Is s C CO O 3 35 50 0p pp pm m a an nd d C CO O C CO O2 2 r ra at ti...

Страница 49: ...urers recommendations at least annually This must be carried out by a competent Gas Safe registered engineer The service details should be recorded on the Benchmark Service and Interim Boiler Work Rec...

Страница 50: ...no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced Yes COMBINATION BOILERS ONLY Is th...

Страница 51: ...er name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas r...

Страница 52: ...er name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas r...

Страница 53: ...structions must be provided e g Benchmark Service Record If this condition is not met the period of warranty will extend to only 12 months from date of installation By registering your appliance you w...

Страница 54: ...from a Trading Standards Authority or a Citizen Advice Bureaux Your Personal Details Vok ra takes care of your personal details in order to protect your privacy Below we detail how we use any data you...

Страница 55: ...Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve the right to change specification without prior notice Consumers statutory rights are not affected Company Reg...

Отзывы: