23
INStAllAtION
Model
1070
M
1100
M
1125
M
1125
t
1140
t
Additional charge
g/m
20
45
Use pipes with the thickness indicated in the following table:
Pipe Ø
thickness
mm
inches
mm
6,35
1/4
0,8
9,52
3/8
0,8
12,70
1/2
0,8
15,88
5/8
1,0
Maximum operating pressure 4.3 Mpa.
9
In case of a drop in excess of 5 m, a siphon must be installed
every 5-7 metres.
9
The given measures are the maximum permitted values.
9
Cooling connections featuring shut-off valves are preconfi-
gured for flare connections.
9
Cooling lines must be as straight as possible and any neces-
sary bends must have a radius grater than 40 mm.
9
Use clean hoses. Make sure the inside is free of dust, resi-
dues, water.
9
Avoid the entry of uncondensable gases (air) in the circuit,
otherwise, with the unit in operation, high pressures with
the risk of damages might ensue.
9
Use copper pipes for cooling systems.
9
Use connecting pipes and tools appropriate for the system's
refrigerant.
0
It is forbidden to use second-hand cooling lines since their
flare connection seal is not guaranteed.
0
It is forbidden to use pre-charged cooling lines.
0
It is forbidden to carry out welding operations with refrige-
rant inside the cooling circuit. If necessary, the refrigerant
must be recovered and the circuit must be cleaned with ni-
trogen without oxygen.
0
Connections
—
position the connecting pipes
OK
OK
OK
9
Plug the pipe ends in order to prevent water or debris from
flowing in.
9
before threading the lines through the hole in the wall, clo-
se the lines ends.
—
cut the pipe end square using a pipe cutter
—
remove burrs keeping the cut edge facing down
—
remove the flare nut on the unit connection
—
insert it into the connection pipe
—
flare the tube
A
Pipe Ø
A
mm
inches
mm
6,35
1/4
9,1
9,52
3/8
13,2
12,70
1/2
16,6
15,88
5/8
19,7
Содержание 20153499
Страница 29: ...29 Installation MODEL 1100 M ...
Страница 31: ...31 Installation MODEL 1125 T 1140 T ...
Страница 42: ......
Страница 43: ......