Start-up, calibration and operation of the burner

6.3

Burner start-up

Feed electricity to the burner via the disconnecting switch on the
boiler panel.
Close the thermostats/pressure switches. Turn the switch of
Fig. 28 to position 

“AUTO”

.

If this is not the case:

place the switch of Fig. 28 in position 

“0”

 and wait for the

control box to carry out the switch-off phase;

disconnect the electrical supply from the burner;

invert the phases on the three-phase power supply.
Once the above steps are complete, the burner should light. 
If the motor starts up, but the flame does not appear and the con-
trol box goes into lockout, reset it and wait for a new ignition at-
tempt.
If ignition is still not achieved, it may be that gas is not reaching
the combustion head within the safety time period of 3 seconds.
In this case increase gas ignition delivery.
The arrival of gas at the pipe coupling is indicated by the U-type
pressure gauge (Fig. 27).
If further burner lockouts occur, refer to the “Release procedure”
given in the equipment manual supplied.

Once the burner has ignited, proceed with the global adjustment
of the burner.
Further interfaces and communication functions with computers,
for remote control or integration in central supervision systems
are available on the basis of the configuration of the system.

The first start-up and curve synchronisation manual is supplied
with the burner. 
At request, the complete manual for the control and setting of all
parameters is available.

DANGER

Make sure that the lamps or testers connected to
the solenoids, or indicator lights on the solenoids
themselves, show that no voltage is present. If
voltage is present, stop the burner 

immediately

and check the electrical wiring. When the burner
starts, check the direction of the motor rotation, as
indicated in Fig. 28.
As the burner is not fitted with a device to check
the sequence of the phases, the motor rotation
may be incorrect. As soon as the burner starts up,
go in front of the cooling fan of the fan motor and
check it is rotating anticlockwise.

WARNING

In the event of a burner lockout, more than two
consecutive burner reset operations could cause
damage to the installation. On the third lockout,
contact the Aftersales Service.

DANGER

If further lockouts or burner faults occur, interven-
tions must only be made by qualified, authorised
personnel (as indicated in this manual, and in
compliance with the laws and regulations current-
ly in force).

WARNING

The first start up and every further internal setting
operation of the adjustment system or the expan-
sion of the base functions require access by
means of password and are to be carried out by
service personnel who are especially trained for
the internal programming of the instrument and
the specific application created with this burner.

AUTO

0

EMERGENCY

STOP

Fig. 28

20097834

Содержание 1135T1

Страница 1: ...t gas burners Modulanting operation CODE MODEL TYPE 20166002 RS 310 E O2 BLU 1138T1 20174926 RS 410 E O2 BLU 1135T1 20179072 RS 410 E O2 BLU 1135T1 20158157 RS 410 E O2 BLU 1135T1 20174930 RS 510 E O2...

Страница 2: ...Translation of the original instructions...

Страница 3: ...or the air fuel ratio LMV52 15 4 13 Actuator 17 4 14 PLL52 module optional 18 4 14 1 Terminal ratings cable lengths and cross sectional areas 18 4 15 Oxygen sensor QGO20 optional 19 4 15 1 Technical d...

Страница 4: ...pressure switch 37 6 5 4 PVP pressure switch kit 37 6 6 Final checks with burner operating 37 6 7 Motor lockout 37 6 8 Description of O2 trim control optional 38 6 8 1 Operating principle of O2 trim c...

Страница 5: ...EMC 2014 30 EU Electromagnetic Compatibility Such products are marked as follows CE 0085CP0166 Classe 3 EN 676 The quality is guaranteed by a quality and management system certified in accordance with...

Страница 6: ...ed out correctly may cause damage to the ma chine and or injury to people DANGER DANGER LIVE COMPONENTS This symbol indicates operations which if not car ried out correctly lead to electric shocks wit...

Страница 7: ...vent of damage to things or injury to people if such damage injury was due to any of the following causes incorrect installation start up use and maintenance of the burner improper incorrect or unreas...

Страница 8: ...intenance Only those parts envisaged by the manufacturer can be replaced 3 2 Personnel training The user is the person body or company that has acquired the machine and intends to use it for the speci...

Страница 9: ...l Gas oil Methane Flame control system FS1 FS2 Standard 1 stop every 24 h Continuous working 1 stop every 72 h Electrical supply of the system 3 400 50 3 230 50 Voltage of auxiliaries 230 50 60 110 50...

Страница 10: ...SK TR I2ELL DE I2EK NL I2Er FR I2E R BE I2E LU PL Model RS 310 E O2 BLU RS 410 E O2 BLU RS 510 E O2 BLU RS 610 E O2 BLU Power 1 Delivery 1 min max kW 400 1200 3630 500 1500 4450 680 1800 5250 1000 22...

Страница 11: ...N 400V 10 50 Hz Fan motor IE2 rpm V kW A 2930 400 690 9 2 16 5 9 6 2880 400 690 12 21 3 12 3 2915 400 690 15 26 8 15 5 Ignition transformer V1 V2 I1 I2 230 V 1 x 8 kV 1 A 20 mA Absorbed electrical pow...

Страница 12: ...he boiler door Tab F WARNING The gas adaptor is set also for DN 80 bore Fig 1 20158832 mm A C D E F G H I L M N O P R T RS 310 E O2 BLU 1135 178 306 520 DN65 575 790 345 1075 400 528 290 1270 970 465...

Страница 13: ...10 E O2 BLU 680 RS 610 E O2 BLU 1000 WARNING The firing rate value Fig 2 has been obtained considering an ambient temperature of 20 C an atmospheric pressure of 1013 mbar approx 0 m a s l and with the...

Страница 14: ...n to special test boilers accord ing to EN 676 regulations In Fig 3 you can see the diameter and length of the test combus tion chamber Example Output 5000 kW diameter 100 cm length 5 m 4 9 Burner equ...

Страница 15: ...ch 19 Combustion head air pressure test point 20 Maximum gas pressure switch with pressure test point 21 Flame sensor probe 22 Hinge for opening the burner 23 Pressure test point for air pressure swit...

Страница 16: ...g the burner is operat ing 10 Auxiliary circuits fuse includes a spare fuse 11 Air pressure switch 12 Ignition transformer 13 Ionisation probe cable 14 Operator panel with LCD display 15 Light signall...

Страница 17: ...void conditions that can favour the development of conden sate and humidity Otherwise before switching on again make sure that the entire control box is perfectly dry Static charges must be avoided si...

Страница 18: ...AC 188 V Oil pump magnetic clutch nominal voltage Nominal current Power factor 2A cos 0 4 Air pressure switch test valve nominal voltage Nominal current Power factor 0 5A cos 0 4 Load on output termin...

Страница 19: ...he holding torque is reduced when the actuator s power sup ply is switched off Technical data Tab I WARNING To avoid injury to persons damage to prop erty or the environment the following warn ing not...

Страница 20: ...e lengths 10 m fino a QGO20 Cross sectional areas Refer to description of QGO20 Analog inputs Air temperature detector Pt1000 LG Ni1000 Flue gas temperature Pt1000 LG Ni1000 QGO20 Refer to data sheet...

Страница 21: ...ning the inlet and outlet allow the sensor to cool down for at least 1 hour Mount the sensor such that the connecting part head to flange is free so that the exchange of air is ensured Otherwise measu...

Страница 22: ...e gas velocity only with AGO20 1 10 m s Fuel type Fuel oil EL or Natural gas H Measuring range 0 2 20 9 O2 Permissible cable length Max 100 m Wire diameter 10 m Power supply lines Net cable Cable diam...

Страница 23: ...table in the wiring diagram To reset in case of an intervention of the thermal relay press the RESET button 1 of Fig 10 The red TEST button 3 opens the NC 95 96 contact and stops the motor CAUTION The...

Страница 24: ...must be free from hazardous mixes e g chloride fluoride halo gen if present it is highly recommended to carry out cleaning and maintenance more frequently WARNING The handling operations for the burne...

Страница 25: ...2 5 Fig 14 is not necessary unless expressly requested by the boiler manufacturer Tab M 5 6 Securing the burner to the boiler Fit the heat insulation supplied onto the blast tube 4 Fig 14 Fit the enti...

Страница 26: ...around the hinge and release the cables of the probe 5 and electrode 11 D Fully open the burner as in Fig 15 F Undo the screw 4 with pressure test point G Release the head by lifting it from its hous...

Страница 27: ...ce the gas butterfly valve The correct position is shown in Fig 17 WARNING Check that the probe and the electrode are placed as in Fig 16 according to the dimensions indicat ed Fig 16 20071251 Electro...

Страница 28: ...310 E O2 BLU burner is equipped with central air gas ad justment The factory setting is the following AIR notch 9 GAS notch 0 Only for specific cases to change the central gas setting do as follows l...

Страница 29: ...27 20173117 GB Installation Fig 20 No Setpoint air gas Max burner output kW 20081480...

Страница 30: ...er 1200 kW 9 Gasket for flanged versions only 10 Pressure adjuster 11 Train Burner adaptor supplied separately P2 Upline pressure of valves adjuster P3 Upstream pressure of the filter L Gas train supp...

Страница 31: ...er gas train combination manual 5 11 3 Gas train installation DANGER Disconnect the electrical power using the main switch Check that there are no gas leaks Pay attention when handling the train dang...

Страница 32: ...he right column 1 the pressure at the test point P1 Fig 25 Add this value to the estimated pressure in the combustion chamber Example for RS 410 E O2 BLU with G20 natural gas Required burner maximum o...

Страница 33: ...fety and efficiency at start up Normally burner stopping is guaranteed by the boiler s thermostat pressure switch If this is not the case a time switch should be fitted in series to TL to stop the FS2...

Страница 34: ...y Bore for M32 2 Consents and safety devices Bore for M20 3 Minimum gas pressure switch Bore for M20 4 VPS gas valve leak detection control kit Bore for M20 5 Gas train Bore for M20 6 Available Bore f...

Страница 35: ...ential pressure gauge Fig 27 with socket on the gas pressure of the pipe coupling and in the combustion chamber The manometer readings are used to calculate MAX burner output using the Tab N Connect t...

Страница 36: ...The first start up and curve synchronisation manual is supplied with the burner At request the complete manual for the control and setting of all parameters is available DANGER Make sure that the lamp...

Страница 37: ...3 Burner adjustment The optimum adjustment of the burner requires an analysis of flue gases at the boiler outlet Adjust in sequence 1 Output upon ignition 2 MAX output 3 MIN output 4 Intermediate out...

Страница 38: ...ssure gauge The connection of the pressure gauge is shown in Fig 29 The standard configuration is that with the air pressure switch con nected in absolute mode Note the presence of a T connection not...

Страница 39: ...operating Tab O 6 7 Motor lockout If the motor does not start it could be because of a thermal relay intervention due to its incorrect calibration or problems with the motor or the main power supply t...

Страница 40: ...of air is reached by reducing the air rate of the air regulating actuators For that purpose the damper positions of these actuators are cal culated from some other load point on the ratio control cur...

Страница 41: ...ves are fitted with light signals or closure opening position indicators that are activated when the electrical supply arrives 7 2 3 Checking and cleaning Combustion The optimum calibration of the bur...

Страница 42: ...ired However if it is necessary to measure the ionisation current dis connect the plug socket on the ionisation probe cable and insert a direct current microammeter with a base scale of 100 A as shown...

Страница 43: ...it all burner components as they were originally assembled DANGER Disconnect the electrical supply from the burner by means of the main system switch DANGER Turn off the fuel interception tap Wait for...

Страница 44: ...ut 8 Faults Possible causes Solutions WARNING In the event the burner stops in order to prevent any damage to the installation do not unblock the burner more than twice in a row If the burner locks ou...

Страница 45: ...es Burner Probe Adjustment field Code All models PT 100 temperature 100 500 C 3010110 All models 4 20 mA pressure 0 2 5 bar 3010213 All models 4 20 mA pressure 0 16 bar 3010214 All models 4 20 mA pres...

Страница 46: ...control function See gas train booklet Gas trains in compliance with EN 676 Please refer to manual Burner Ramp type Code All models MB CB 3010344 WARNING The installer is responsible for the addition...

Страница 47: ...LMV 52 6 Functional layout LMV 52 7 Functional layout LMV 52 8 Functional layout LMV 52 9 Functional layout LMV 52 10 Functional layout LMV 52 with kit O2 11 Functional layout LMV 52 12 Functional la...

Страница 48: ...20169327 46 GB Appendix Electrical panel layout 0 1 1 1 1 2 3 4 4 52 2 4 2 6 6 2 6 2 7 6 8 6 2 6 2 2 6 6 6 6 6 96 9 9 6 6 2 7 6 2 2 2 RS 310 DIRECT START UP...

Страница 49: ...47 20169327 GB Appendix Electrical panel layout 0 0 0 0 1 2 30 03 41 1 3 1 5 5 1 5 1 6 5 7 5 1 5 1 1 5 5 5 5 5 85 8 8 5 5 1 6 5 1 1 1 RS 410 DIRECT START UP...

Страница 50: ...20169327 48 GB Appendix Electrical panel layout 0 0 1 2 30 2 0 0 2 4 0 5 5 0 5 0 6 5 7 5 0 5 0 0 5 5 5 5 5 85 8 8 5 5 0 6 5 0 0 0 0 0 RS 410 STAR TRIANGLE START UP...

Страница 51: ...49 20169327 GB Appendix Electrical panel layout 0 0 1 20 3 0 0 3 4 0 5 5 0 5 0 6 5 7 5 0 5 0 0 5 5 5 5 5 85 8 8 5 5 0 6 5 0 0 0 0 0 RS 510 STAR TRIANGLE START UP...

Страница 52: ...20169327 50 GB Appendix Electrical panel layout 0 1 2 2 3 4 4 4 5 4 6 4 4 4 4 4 4 4 74 7 7 4 4 5 4 RS 610 STAR TRIANGLE START UP...

Страница 53: ...51 20169327 GB Appendix Electrical panel layout ALL MODELS RS 310 RS 410 DIRECT START UP...

Страница 54: ...20169327 52 GB Appendix Electrical panel layout RS 310 RS 610 STAR TRIANGLE START UP...

Страница 55: ...53 20169327 GB Appendix Electrical panel layout 0 1 1 2 1 2 3 1 4 1 2 1 2 2 1 1 1 1 1 51 5 5 1 1 2 3 1 2 ALL MODELS...

Страница 56: ...20169327 54 GB Appendix Electrical panel layout 0 1 2 1 2 3 1 3 4 1 5 1 3 1 3 3 1 1 1 21 2 1 61 6 6 2 1 1 3 4 1 3 ALL MODELS...

Страница 57: ...55 20169327 GB Appendix Electrical panel layout ALL MODELS...

Страница 58: ...20169327 56 GB Appendix Electrical panel layout ALL MODELS...

Страница 59: ...57 20169327 GB Appendix Electrical panel layout 0 ALL MODELS...

Страница 60: ...20169327 58 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 30 3 3 0 0 1 0 ALL MODELS...

Страница 61: ...59 20169327 GB Appendix Electrical panel layout 0 1 1 1 2 ALL MODELS...

Страница 62: ...20169327 60 GB Appendix Electrical panel layout 01 2 2 2 01 2 2 3 3 3 4 3 5 3 3 3 3 3 3 3 3 3 3 4 3 01 01 0 0 0 ALL MODELS...

Страница 63: ...61 20169327 GB Appendix Electrical panel layout 01 2 2 2 2 2 3 3 3 4 3 5 3 3 3 3 3 3 3 3 3 3 4 3 01 01 01 ALL MODELS...

Страница 64: ...20169327 62 GB Appendix Electrical panel layout 0 1 0 2 3 2 4 5 67 5 7 5 7 6 5 7 8 9 4 9 5 7 6 5 7 8 9 4 9 2 3 1 0 1 0 3 3 3 9 RS 310 RS 410 DIRECT START UP...

Страница 65: ...63 20169327 GB Appendix Electrical panel layout 0 1 0 2 3 2 4 5 67 5 7 5 7 6 5 7 8 9 4 9 5 7 6 5 7 8 4 9 5 7 6 5 7 8 4 5 7 6 5 7 8 9 4 9 2 3 1 0 1 0 3 3 3 9 RS 310 RS 610 STAR TRIANGLE START UP...

Страница 66: ...20169327 64 GB Appendix Electrical panel layout 0 1 1 1 1 1 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 0 2 3 ALL MODELS...

Страница 67: ...tacts output relay burner lockout KL1 Star triangle starter line contactor KT1 Star triangle starter triangle contactor KS1 Start triangle starter star contactor KST1 Star triangle starter timer MV Fa...

Страница 68: ...Subject to modifications RIELLO S p A I 37045 Legnago VR Tel 39 0442 630111 http www riello it http www riello com...

Отзывы: