
29
20173117
GB
Installation
5.11.2 Gas train
Approved according to standard EN 676 and provided separately
from the burner.
To select the correct gas train model, refer to the supplied "Burn-
er-gas train combination" manual.
5.11.3 Gas train installation
DANGER
Disconnect the electrical power using the main
switch.
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Make sure that the gas train is properly installed
by checking for any fuel leaks.
The operator must use the required equipment
during installation.
Fig. 25
20069490
Содержание 1135T1
Страница 2: ...Translation of the original instructions...
Страница 29: ...27 20173117 GB Installation Fig 20 No Setpoint air gas Max burner output kW 20081480...
Страница 53: ...51 20169327 GB Appendix Electrical panel layout ALL MODELS RS 310 RS 410 DIRECT START UP...
Страница 54: ...20169327 52 GB Appendix Electrical panel layout RS 310 RS 610 STAR TRIANGLE START UP...
Страница 57: ...55 20169327 GB Appendix Electrical panel layout ALL MODELS...
Страница 58: ...20169327 56 GB Appendix Electrical panel layout ALL MODELS...
Страница 59: ...57 20169327 GB Appendix Electrical panel layout 0 ALL MODELS...
Страница 60: ...20169327 58 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 30 3 3 0 0 1 0 ALL MODELS...
Страница 61: ...59 20169327 GB Appendix Electrical panel layout 0 1 1 1 2 ALL MODELS...
Страница 66: ...20169327 64 GB Appendix Electrical panel layout 0 1 1 1 1 1 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 0 2 3 ALL MODELS...