
25
20173117
GB
Installation
5.8
Probe-electrode position
5.9
Gas butterfly valve
If necessary, replace the gas butterfly valve. The correct position
is shown in Fig. 17.
WARNING
Check that the probe and the electrode are placed
as in Fig. 16, according to the dimensions indicat-
ed.
Fig. 16
20071251
Electrode
Probe
Place in line with the hole
RS 410-510-610/E O
2
BLU
RS 310/E O
2
BLU
Fig. 17
20078516
YES
NO
Содержание 1135T1
Страница 2: ...Translation of the original instructions...
Страница 29: ...27 20173117 GB Installation Fig 20 No Setpoint air gas Max burner output kW 20081480...
Страница 53: ...51 20169327 GB Appendix Electrical panel layout ALL MODELS RS 310 RS 410 DIRECT START UP...
Страница 54: ...20169327 52 GB Appendix Electrical panel layout RS 310 RS 610 STAR TRIANGLE START UP...
Страница 57: ...55 20169327 GB Appendix Electrical panel layout ALL MODELS...
Страница 58: ...20169327 56 GB Appendix Electrical panel layout ALL MODELS...
Страница 59: ...57 20169327 GB Appendix Electrical panel layout 0 ALL MODELS...
Страница 60: ...20169327 58 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 30 3 3 0 0 1 0 ALL MODELS...
Страница 61: ...59 20169327 GB Appendix Electrical panel layout 0 1 1 1 2 ALL MODELS...
Страница 66: ...20169327 64 GB Appendix Electrical panel layout 0 1 1 1 1 1 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 0 2 3 ALL MODELS...